PSB0016
Written evidence submitted by St Aloysius RC VA Infant School
Summary
- In July 2014 we submitted an application for PSBP2 and were subsequently declined in February 2015.
- Our application was based firstly upon projected pupil numbers in Hebburn, South Tyneside Metropolitan Borough Council, over the next 3-10 years
- Secondly, the Infant school was built in 1928, as a prefabricated building and is constructed of asbestos panels to walls and ceilings both internally and externally which prevents any building improvements.
- Our kitchen, dining areas and two classrooms are housed in prefabricated temporary buildings dating from the 1950’s, which are not fit for purpose.
- The classrooms in the main body of the building house 30 children in classrooms designed for 24 children.
Factual information
- We are a rapidly improving, oversubscribed, federation of an Infant and Junior school.
- We recently commissioned an independent condition survey of our Infant school buildings which highlighted the following problems:
- The external walls of the main building consist of asbestos cement cladding panels with painted softwood moulds over joints.
- The lintels to the window openings are significantly corroded, which has resulted in expansion and lifting of the brickwork joints causing a horizontal crack at this level allowing rainwater ingress to the framework behind. Currently the repair to the external cladding is not feasible due to the risk of asbestos contamination.
- There is evidence of diagonal cracking to the East corner, the repair is not feasible due to the risk of asbestos contamination.
- The older temporary classrooms have extensive wet rot decay and the brick piers on which they are built have subsided and are beyond cost effective repair.
- The windows are single glazed and the floorboards exposed with no insulation. They consist of asbestos linings and the cost of repair is prohibitive.
- A complete overhaul of the gutters and cast iron rainwater pipes is required.
- It is recommended that all the temporary portakabins be demolished.
- The assembly hall ceiling and inner walls are asbestos panels and are thermally inadequate with evidence of rising damp.
- Due to the increase of electrical appliances within the school the mains is undersized and needs upgrading.
- Cost of immediate necessary repairs: £2,463,000
Recommendations
- To make clear how our rapidly improving schools can cater for the current needs of pupils and the future needs of our community, in a school not fit for purpose with no timeline for significant improvements.
- To consider that the PSBP2 programme may be flawed in that too many schools are chasing too little money with no realistic chance of being successful in their bids.
- To publish the formula used to determine who would receive funding.
Appendices
- Asbestos cement gable end (consistent with rest of the building)

- Temporary buildings from 1950’s

- Evidence of reduced ventilation due to obscured air bricks –
- Cracked window openings

- Plinth brick ventilated cavity

March 2015