Written evidence submitted by the Halifax and
District Rail Action Group (IRP0086)
About HADRAG
The Halifax & District Rail Action Group is a campaigning rail users’ group centred on the routes through Halifax, Sowerby Bridge and Brighouse on the Calder Valley Line (CVL). We began in 1985 and campaigned for reopening of the lines through Elland and Brighouse, seeing success in 2000 with opening of Brighouse station, and we continue to argue for improvement. We are hopeful that Elland station will open in the next two years. In 2018, HADRAG along with three other user groups along the line launched the Electric Railway Charter to press the argument for a rolling programme of electrification, including the full Calder Valley route as recommended in the Northern Electrification Task Force report in March 2015: “Northern Sparks”.
In the wake of the Covid-19 pandemic, our railways must repurpose to flourish. We hope city travel will undergo a revival, but there may be a permanent reduction in city-based commuting and business travel. This should be seen as an opportunity not a threat. Rail and other public transport systems must be transformed to meet a wider range of needs supporting leisure and personal travel needs. The climate crisis becomes ever more urgent, and all transport must become zero-carbon. Rail must play a major role, encouraging modal transfer to reduce congestion and pollution, improving individual human wellbeing and protecting the global environment. Modern, clean public transport needs to be branded “sociable transport”, “popular transport” – transport for wellbeing.
Short summary
The IRP offers an incomplete programme of enhancements. Decarbonising through electrification of existing routes – including the full Calder Valley Line – in a rolling programme starting now must be a priority over large scale new lines that will take another 20 years to build. This is about urgent rebuilding after the pandemic.
We will support more high speed rail (NPR) proposals if they offer a better deal for our line, for example an NPR interchange in lower Calderdale. But if we are offered a choice between electrification now and more high speed projects in the future, we opt for electrification now.
Value for money should be measured in terms of reducing CO2 emissions, and opening up rail travel to as many of the population as possible. Good growth; sustainable growth. That is why we are submitting this response.
Summary of background and key points:
This response, which is quite short, specifically addresses issues with issues related to our area:
In the light of the above the following are major concerns and suggestions:
(a) We welcome the IRP announcement of Leeds-Bradford electrification and reduction of journey time to 12 minutes. But this raises issues:
In light of the above there needs to be a plan for full CVL electrification from Yorkshire to East Lancashire, Preston and Manchester as part of a cost-saving rolling programme to decarbonise all railways in the North.
(b) Bradford needs a new through station offering increased capacity. It must be close to the Interchange site (not outside the city centre as would be the St James site proposed by Bradford Council) and linked to NPR, the Calder Valley Line and Airedale/Wharfedale routes. With a well-sited station, and a new line, the journey time between Leeds and (central) Bradford could be reduced to 8-10 minutes and conflicts due to the present terminus would be removed.
(c) Cancellation of NPR via Bradford is disappointing, and gives rise to wider concerns. IRP proposes a high-speed line from Warrington to a point in the Colne Valley near Marsden. From that point 3 or 4 tracks are proposed to Dewsbury, but IRP has no proposals for increased capacity from Dewsbury to Leeds. This will limit not only NPR services but local and regional services that link the Colne Valley and Calderdale (via Brighouse) with Dewsbury and Leeds.
(d) The technical annex to IRP[3] quotes a price of £17bn for the core NPR network proposed.
(e) If the NPR line, or a branch, is built to Bradford, its usefulness could be enhanced by having a station in lower Calderdale near Brighouse or Elland with connections available to the local transport network including the CV line, future mass-transit, and buses.
(f) We welcome funding for a start to be made on WY mass transit.
(g) TRU helps the Calder Valley service. We welcome plans for TransPennine Route Upgrade (we hope with full electrification of the present route). In particular the 4-tracking Huddersfield-Dewsbury should enable enhancement of CVL services via Elland and Brighouse, so is important for more than the Huddersfield line. This scheme announced a decade must go ahead without further delay.
(h) But in truth the Integrated Rail Plan is not integrated. It deals with high speed proposals, with completion dates at least 20 years in the future. It mentions mass-transit, equally far away. It fails to mention improvements, including wider electrification, needed short term to develop better services for present and future work and leisure travellers, rebuild our public transport after the present pandemic and build a system fit to complement new lines such as NPR which will be built over a more distant timescale.
We need action – to improve services and electrify our line – now. We must not have to wait two decades for proposals that will barely benefit our line and its passengers.
(i) Value for money should be measured in terms of reducing operating costs, effectiveness in achieving zero-carbon by the mid-century deadline, and attracting a larger proportion of the population who support our whole transport network through taxation to rail travel. Electrification will pay back. It is not just about cost cutting in crude financial terms.
Some points in more detail
1 This response relates to the objectives about capacity and connectivity, levelling up, and value for money.
2 Calder Valley Line electrification as part of a rolling programme
2.1 Electrification is essential for decarbonisation. Railways are already low carbon and can easily become zero-carbon. We prioritise electrification ahead of ambitious high speed proposals.
2.2 In 2015 all-party Northern Electrification Task force (NETF), produced the Northern Sparks report, which proposed electrification of most lines in three phases. The first phase was to be a 5-year plan over the 2019-24 control period, covering 12 routes. Top-ranked route on business, economic and environmental criteria was the full Calder Valley Line from Leeds via Bradford and Brighouse to Manchester (via Rochdale) and Preston (via East Lancs). The assumption was that planned schemes for the Huddersfield (TP Route Upgrade) and Midland Main Lines would have already gone ahead.
In 2020 Network Rail published its TDNS – traction decarbonisation network strategy – calling for electrification of around 85% of existing non-electric routes.
2.3 Alternative forms of decarbonisation are less efficient than pure electric – they waste more energy for example in storing energy in hydrogen and then getting it back or in charging and discharging batteries:
Type of train | Pure electric | Hydrogen | Battery |
Energy efficiency (amount not wasted in transfers)
| 80% | 65% | 34% |
Efficiency is reduced when bi-mode or tri-mode trains have to be used because of the weight of additional equipment. This is one reason why network electrification is favoured.
Of course, all energy transfers involve some waste. But in the interests of combatting climate change and saving resources we must seek to minimise this waste.
2.4 The Rail Industry Association has shown that a rolling programme of electrification would be expected to save 33-55% of capital costs.[4]
2.5 Electrification in the past has been paid for through savings in operational costs in the future – for example British Rail’s electrification of the East Coast Main Line in 1985-91.
2.6 Electric trains are cheaper to operate and encourage more revenue because:
2.7 We welcome the IRP commitment to electrify Leeds to Bradford Interchange. But we are disappointed this is not presented as the first stage of full CV line electrification as recommended by Northern Sparks, and as part of a rolling programme to electrify most of the network.
2.8 The Calder Valley Line also carries heavy freight trains. Electrification is even more essential if freight is to be decarbonised.
3 NPR, Bradford and the Calder Valley Line
3.1 We agree with the IRP that the proposed Bradford station at the St James site was unsatisfactory, although it would have given a journey time of 8 minutes, Leeds-Bradford. St James would have been about 10 minutes’ walk from the centre of Bradford, and even with modern links within the city would be much less convenient than the present Interchange station cancelling out the saving offered by an 8-minute journey from Leeds. A 10-minute journey from Leeds to a genuinely central Bradford through station would be preferable. Such a station could also link with the CV line that uses Interchange, and with Airedale/Wharfedale routes that at present use Bradford Forster Square station.
3.2 IRP Technical Appendix Fig 9 gives a timing Leeds-Halifax (currently around 34 minutes) by the chosen hybrid core network of 27 minutes (we think this may be slightly pessimistic), 24 min by the potential wider network. “TfN preferred” option gives 34 minutes, which must mean the assumption is use of the unimproved route Leeds-Bradford. If the CV line were linked to NPR as proposed by TfN in Bradford, Leeds-Halifax time would the time would come down to around 20 minutes, dependent on Leeds-Bradford journey time. This is a cut of almost a quarter of an hour in journey time and would benefit all stations west of Halifax on both Manchester and Blackpool routes.
3.3 Elland station (expected to open by 2024) and Brighouse are served by an hourly (currently 2-hourly during the Omicron staffing situation) service Bradford-Huddersfield and hourly Monday-Saturday Manchester-Dewsbury-Leeds. Elland and Brighouse serve a population equalling that of upper Calderdale stations combined, but have a much poorer service. A service from Brighouse to Leeds via Halifax, Bradford and NPR would take about 30 minutes, via an indirect route. We suggest:
The above improvements are needed long before NPR comes to fruition.
3.4 New high speed routes will be much more popular if they serve more places, which is why we want an NPR station in Calderdale as well as a link to NPR in Bradford. Possibilities include:
3.5 As mentioned above the Technical Annex offers an NPR branch from Huddersfield to Bradford. The journey time Bradford-Manchester is estimated at 30 minutes, using new or reopened lines. As with all NPR options the precise route is not made public, a serious general concern about this whole process.
3.6 NPR as proposed by IRP would have high-speed Warrington-Marsden, 3 tracks into Huddersfield, 4 tracks thence to Dewsbury, and then the present 2-track route Dewsbury-Leeds with little if anything apparently yet planned on how this would be relieved. As already implied, the Dewsbury line carries local stopping/semi-fast services on the lines via Brighouse (Calder Valley) and the Huddersfield line. There is demand for improvement of these services. In mitigation we think:
3.7 Whatever form NPR eventually takes, the Trans Pennine Route Upgrade (TRU) including 4-tracking Hud-Dewsbury, is essential to allow a good mix of fast and stopping services on the Huddersfield line and along the Calder Valley line via Brighouse and Elland and much needed development of local services on these routes.
3.8 We expect TRU to include full electrification of the existing Huddersfield line from Manchester to York, with a plan to extend to the Calder Valley line and to Hull.
4 Mass transit – we welcome the £100M funding for West Yorkshire, some of which is for development of the mass transit.
5 Value for money should be measured in broad terms with environmental issues and carbon-reduction at least as important as traditional commercial, growth-based objectives:
6 Conclusion: if we have a choice between getting on with electrification of existing routes now and having a high speed network in two decades’ time:
Finally, it is unfortunate that IRP Technical Annex has only been published this week, giving us very short time to produce an informed submission.
January 2022
Endnotes
[1] Northern Sparks: Northern Electrification Task Force (NETF) all-party report, March 2015 EFT_Report_FINAL_web.pdf (transportforthenorth.com);
TDNS: Traction Decarbonisation Network Strategy - Interim Programme Business Case (networkrail.co.uk)
[2] RIA: Rail Industry Association - Electrification Cost Challenge Report (riagb.org.uk)
[3] This was after the original deadline (24 Jan) for this consultation, and 3-4 days before the extended deadline (27 January). Integrated Rail Plan for the North and the Midlands: technical annex (publishing.service.gov.uk)
[4] RIA Electrification Cost Challenge Report (riagb.org.uk)