Defence Committee

Oral evidence: MoD Annual Report and Accounts, HC 777

Tuesday 24 November 2026

Ordered by the House of Commons to be published on 24 November 2026.

Watch the meeting

Members present: Mr Tanmanjeet Singh Dhesi (Chair); Alex Baker; Graeme Downie; Lincoln Jopp; Emma Lewell; Mike Martin; Jesse Norman; Ian Roome.

Questions 1-139

Witnesses

I: Jeremy Pocklington CB, Permanent Secretary; Rupert Pearce, National Armaments Director; Air Marshal Tim Jones CBE, Deputy Chief of the Defence Staff (Force Development); Aneen Blackmore, Director General Finance, Ministry of Defence


Examination of witnesses

Witnesses: Jeremy Pocklington, Rupert Pearce, Air Marshal Tim Jones and Aneen Blackmore.

Chair: This is a House of Commons Defence Committee session on the MoD annual report and accounts for 2025-26. It is a pleasure to welcome some regular attendees of our Committee from the Ministry of Defence: Jeremy Pocklington, the permanent secretary, Rupert Pearce, the national armaments director, and Air Marshal Tim Jones, the Deputy Chief of the Defence Staff for force development, who it is a pleasure to welcome back. And I give a warm welcome to Aneen Blackmore, the director-general of finance. Thank you so much for making time to give evidence today. Without further ado, ladies and gents, let us move to the questioning.

  1.              Lincoln Jopp: Permanent Secretary, when the Secretary of State last came before us, he said, “When I came in, the finances for this fiscal year were off track, and we needed to make some savings to bring them into line and balance the books.” As the principal accounting officer, how did you allow the finances to go off track?

Jeremy Pocklington: I think what the Secretary of State was referring to was that, at the start of the financial year, we were managing financial pressures. Obviously, as a Department, like other large Departments, we set our budgets in line with the parameters that the Treasury has set us. That is what we did, as normal, in the MoD this year. We of course faced pressures this year, including, for example, rising fuel costs associated with the impact of events in the middle east—like other large organisations, we were having to deal with that.

What we are doing and continue to do is to manage those pressures so that we are able to live within the parameters that the Treasury has set us. The position today is that we remain on track to do that this financial year. But of course, I have large and complex budgets, and not all spending is under direct control or can be directly forecasted in advance. The reassurance that I will give the Committee is that I take my job as principal accounting officer very seriously in managing our budget as effectively as possible.

  1.              Lincoln Jopp: Okay, so it was off track, but it is now on track. To give another chance to explain what the Secretary of State meant, he said that “it was important for me to signal very early on that we cannot have a culture of overspending in the Ministry of Defence.” In your first answer, you seem to be saying that it is systemic, that people are due to overspend and then they have to be reined back, in year, when cost pressures emerge. Do you recognise that characterisation? And on the culture point, do you not have to change that to meet the Secretary of State’s desires?

Jeremy Pocklington: In a large and complex budget like that of the MoD, of approximately £70 billion, we will always be managing areas of cost pressures and other areas of the budget where we do not spend as much as we had forecast. That is always going to happen with the complexity of what we do, and the fact that some of our spending is, in essence, determined by geopolitics, international markets and costs in the supply chain that are not always possible to predict. There will always be a job to do to manage our budget but, crucially, I agree that we have to undertake and improve our oversight of financial management in the Department. That is a key tenet of the defence reform programme.

This year, 2026-27, is the first year where we have been operating and implementing the changes that we have made through defence reform. I have already talked to the Committee about that. In particular, it is the first year where we have allocated budgets according to the four key areas in defence reform, which replaced the 14 top-level budgets that we used to hold. It is also the first year where we have had the “invest”, “readiness” and “operate” budgets all, in a way, subordinate to the key totals on our RDEL and CDEL. We have a number of reforms, which I could talk more about, designed to improve financial management in the Department, but this is the first year that we are operating under defence reform.

  1.              Lincoln Jopp: You have simplified it to four key areas. I think the defence investment plan sees you generating savings of £10.7 billion. Can you divide that £10.7 billion of savings, in large chunks, across those four key areas?

Jeremy Pocklington: The £10.7 billion ultimately derives from a range of different sources—I am going to see whether DG finance can give you the precise numbers—and that relates to savings across the whole Department, in areas such as service redesign, workforce reductions, lower external assistance, better use of the estate, better segmentation of procurement and better management of suppliers.

Aneen Blackmore: As set out in the defence investment plan, the horizontal strands that Jeremy referenced are underpinned by a programme. We do have an allocation against that for each of the areas, because the areas are the primary deliverers and are accountable for ensuring that those efficiencies are delivered. I do not have the figures split by area, but we can certainly share them, because that is what we report on monthly. It is the areas’ efficiency plans that we set out to the executive committee.

Jeremy Pocklington: All areas will need to make efficiency savings. Obviously, the bulk of our budget is in MSHQ and then in the National Armaments Director Group, so proportionately, that is where the bigger efficiency savings will need to be made.

Lincoln Jopp: Okay. Since you say you have simplified it, can you write to us with the £10.7 billion split out across those four key areas? That would be fantastic.

Jeremy Pocklington: We will do that.

  1.              Jesse Norman: Ms Blackmore, to follow up on that, you have those four key areas that you described. What percentage of the MoD budget is allocated to them?

Aneen Blackmore: Just so I understand the question, the budget is allocated in totality across those four areas. Do you mean in relation to efficiency?

  1.              Jesse Norman: So there is no element of the budget that is not allocated to some area?

Jeremy Pocklington: Correct.

Aneen Blackmore: That’s right.

  1.              Jesse Norman: I would be very interested to know how you have done that, because allocation of central costs is almost impossible in large organisations, so it will be interesting to look at how you do that. Will we be able to have the information that allows us to see how you have allocated some of those costs to different areas?

Aneen Blackmore: Yes, and I—

  1.              Jesse Norman: Is that a yes?

Aneen Blackmore: We can share that. What might be helpful to understand is that the Department of State is the structure that would hold some of the central costs that you might be referring to. It is important that all costs sit with an accountable owner somewhere, so any of those central costs would sit within the Department of State.

Jesse Norman: You are saying, I think, that there is no cost that is not allocated to one of those four areas—the bureaucrat’s dream.

Aneen Blackmore: That is absolutely right.

  1.              Jesse Norman: So there is no element of central cost that just covers the whole and is not allocated?

Aneen Blackmore: Correct.

  1.              Jesse Norman: Does that include all the budget for which the permanent secretary is responsible?

Jeremy Pocklington: I am responsible for every penny that the Department spends, of course, as principal accounting officer.

  1.         Jesse Norman: Are you responsible for the NAD budget?

Jeremy Pocklington: I am principal accounting officer for every single penny that the Department spends, wherever it is spent. Obviously, however, once the money is allocated down to the four areas, Rupert becomes the budget holder for the NAD Group, and Rupert reports to me as principal accounting officer on effective expenditure consistent with the principles in “Managing Public Money”.

  1.         Jesse Norman: So the reform process looks as though it has essentially devolved some responsibility, but actually, from an accounting and accountability standpoint, you remain—

Jeremy Pocklington: I am principal accounting officer for the Ministry of Defence.

  1.         Jesse Norman: You are the single person responsible for the whole thing.

Jeremy Pocklington: Correct. 

Jesse Norman: I just want to make sure I have that right. To follow up, Ms Blackmore, the permanent secretary has mentioned that defence reform is supposed to include a lot of financial improvements. Can you describe some of the improvements you have made? Give us the top three so that we have something we can get our teeth into—in terms of scale of improvement and positive cost-benefit change.

Aneen Blackmore: One thing we are really clear on in ensuring we have a robust financial management system is making sure that, from approvals due to contract commitments to in-life spend, we are confident that the spend aligns with our strategic direction and the effect we are trying to drive, and that we are regularly assessing that. That is core to the financial management—

  1.         Jesse Norman: You were not confident about it before, and reform has made you confident about it now.

Aneen Blackmore: We have built in systems that allow us to test more regularly and prioritise within that strategic framework. This comes to the earlier point of how we assure long-term affordability: it is about the structures we are setting up to ensure that we are regularly able to prioritise against the strategic intent.

A big change we have made structurally is the introduction of the three strategic cycles, which we put in place through defence reform. That is the integrated force cycle, the strategic effects cycle and the strategic planning. At a very high level, that ensures that our force design and inputs match our expected output, within a plan that ensures we are delivering the strategic defence review in our affordability framework.

Those cycles are intended to operate to ensure that the system is coherent but also flexible. We have challenges all the time, as you would expect in defence, whether that is changes in our threat environment, our programmes or our financial risk, so it is about how we respond to those. Very briefly on that, the introduction of portfolios allows us to spin a balance more agilely and flexibly to keep affordability as we go through.

  1.         Jesse Norman: We get a limited amount of time. That is your one, so what is your two and three in a sentence each?

Aneen Blackmore: The second is looking at the finance function itself. We have spoken previously about how we are strengthening the finance function, ensuring we have common processes and a single source of data, and investing in new tools so we can pull up information much more quickly and have more confidence in the accuracy of the data we are sharing.

For the third, I would pull out how we work outside of Defence, both cross-Government and with our industry partners. That is how we can build confidence across Government on the baseline position and the numbers we are looking at, and build confidence in our forecasting and planning by working with suppliers in a different way.

  1.         Jesse Norman: How much improvement in productivity should we expect next year and the year after as a result of these changes?

Aneen Blackmore: Productivity captures both how we want to be internally more efficient—we have set that out, and that is the £10.7 billion we are driving towards, which we can talk more about—and also how we are driving productivity in our supply chain. There is some significant work happening—

  1.         Jesse Norman: Will you write to us with those different measures and what your expectations are?

Aneen Blackmore: On productivity?

Jesse Norman: Yes.

Aneen Blackmore: We can share more detail on that.

  1.         Jesse Norman: Brilliant. And on how much you are spending on consultants and how much that has changed—last year, this year and next year. Maybe give us a sense of it now.

Aneen Blackmore: I do not have those figures with me at the moment, but we can certainly write on it.

  1.         Jesse Norman: But should we expect it to be billions of pounds?

Aneen Blackmore: Yes, but it is worth noting that consultancy in defence, according and in alignment with the Government framework, will include significant spend, for example, with AWE, where we are building facilities. It also includes significant spend through our defence medical services. We could give you a bit of a flavour of what it is in that.

  1.         Jesse Norman: What I mean by consultants is where you have brought in a third party to do stuff you could do if you decided to staff up the client function in MoD. It is where you get in the Boston Consulting Group, PwC or people like that to do work for which you cannot afford to pay civil servants within your schedule of pay, or because of other specific reasons—that is the group I am trying to get at.

Aneen Blackmore: We will definitely write to you with more information; we will see whether that answers your question. I note that when we use external systems, it is about not only whether we have skills available within defence but the length of time for which we wish to have those skills available to us. It is clearly not value for money to bring in civil servants for a piece of work that will take only a couple of months.

  1.         Jesse Norman: Right. What is your threshold, where if you had a consulting firm with you for longer than x, you would regard it as a mistake because you could have hired a civil servant or brought in specialist skills? What would that be a year or two years?

Aneen Blackmore: As you would expect, we have a value for money test, and all external assistance is signed off centrally. We want to drive this down and ensure that we use it only where we have to and are confident that it is a value-for-money approach, whether that it is through skills or the length of time for which we need the individuals. It is on a case-by-case basis, and it is for the business requesting the spend to set that out to us.

Jesse Norman: If you could write to us, that would be great. Thank you.

  1.         Ian Roome: On the value for money test, do you think it is acceptable for the MoD—whoever signs this off—to pay £373,000 for a single bed space? That is in the latest report, which came out the other week: you spent £18.6 million on 50 single living accommodation places, costing £373,000 per bed space—I live in a four-bedroom house in Devon, and actually, that would buy it. Who is overseeing the costs of these programmes? It is unacceptable for the MoD, with taxpayers’ money, to pay £373,000 for one single bed space, as was in the report that came out two weeks ago. Who was responsible for signing that off?

Aneen Blackmore: To help, could you clarify for me which report you are referring to?

Jeremy Pocklington: Which report is that?

Ian Roome: It is the Elphicke Ross report.

Graeme Downie: Yes, the Elphicke Ross review of single living accommodation.

Rupert Pearce: I am sorry; I haven’t seen that.

  1.         Ian Roome: I am asking because obviously, someone in the Ministry of Defence signed this off, and I do not know which officer ultimately signs that.

Jeremy Pocklington: It is a very large and complex Department.

Ian Roome: Yes, but what I am trying to ask is who is ultimately responsible—

Jeremy Pocklington: By commissioning that review, we have recognised that we need to reform and have a better system. If you want to be given more specific detail on very specific examples quoted from that report, in a system that is large and complex, it requires advance notice.

Ian Roome: This is taxpayers’ money, and you have said that you are ultimately responsible for this.

Jeremy Pocklington: I am very conscious of that.

Ian Roome: Yes, but do you think it is acceptable to pay this?

Jeremy Pocklington: I don’t know enough about the specifics to comment off the hoof—you would not expect me to do that, Mr Roome—but I am very happy to look in detail at that specific example. As I have said, we have recognised that we need to improve the system to drive better value for money for the taxpayer, which is what we always strive to do.

  1.         Ian Roome: When I read the report, Jeremy, I thought to myself that this was absolutely somebody saying, “The MoD’s just ticking something off here.” These minute details add up to the bigger procurement decisions, so it all adds up. It is absolutely not right for the MoD to have paid £373,000 for 50 bed spaces.

Jeremy Pocklington: I strongly agree with the spirit behind this: look after the pennies and the pounds will look after themselves. The numbers you are talking about are large amounts of money, although in a budget of £70 billion, they are only a small element. But we absolutely need to get after it and have a system that drives value.

Rupert Pearce: To answer your question, Mr Roome, that would normally sit within my group, inside the Defence Infrastructure Organisation, which is responsible for most of the Defence estate, including single living accommodation and family accommodation. We have sat before the Committee before to talk about Annington Homes, and about stepping up and giving our armed forces the quality accommodation that they deserve in future. It sounds to me like that is part of a wider development proposition; I don’t know that, but we can find out and write to you on it.

  1.         Ian Roome: There was £18.6 million spent on that project to provide 50 bed spaces, and that is in the report that came out on 10 November. I now hear you talking about value for money. I do not think that paying £373,000 for one bed space is value for money. Somebody might be saying, “The MoD? Put this figure in,” and somebody has just signed it off. In the midst of everything, it might be a minute column on an accounting spreadsheet.

Rupert Pearce: It is not a minute column, by the way.

Ian Roome: Definitely not, that’s what I’m saying.

Rupert Pearce: It doesn’t sound right.

Ian Roome: But someone is paying it.

Rupert Pearce: Let us find out, but I suspect there are wider circumstances at play here. We treat taxpayers’ money very carefully. There is no culture of overspending that I see within defence. There are lots of issues with how we spend money, making it better and providing better value for money over time, but no one out there is spending money for the fun of it and not taking it very seriously. Let me look into that; we will come back to you specifically on that programme and explain it.

Ian Roome: It is in the report that came out.

Rupert Pearce: If there is something that has gone badly wrong, we will accept that and fix it. Thank you for bringing this to me. We will come back to you.

Chair: Permanent Secretary, it is very concerning that nobody is able to answer questions on the Elphicke Ross review, which I intend to ask questions on once my colleagues have finished with their questioning. Mr Roome’s question is not something extraordinarily difficult; it is not rocket science. It is actually within the review. That is not good.

  1.         Emma Lewell: On the back of my colleague’s question, can anyone on the panel remind me what the spending limit is for ministerial sign-off at the MoD?

Aneen Blackmore: I need to confirm this, but on an approvals basis, for specific business cases, I think it is £1.2 billion.

  1.         Emma Lewell: And what about non-business cases? I presume there are limits, so that the Department cannot go off spending and doing what it wants.

Jeremy Pocklington: We have a system of delegations in the Department.

Aneen Blackmore: We have a very complex system of delegations with different lenses in place, but that is from investment cases, where we recognise losses in our accounts and where we set up contingent liabilities. Each of those have specific approval limits that we need to share with the Treasury and Parliament, so it is quite a complex list.

It is not simply, “Here are your spending limits for the entirety of your budget.” It is broken down into specific types of expenditure, and that is part of what the NAO audits every year to ensure that we are following “Managing Public Money” rules. Again, we can write to you and share a breakdown, but there is quite a detailed framework of what we are allowed to sign off within the MoD and what we need to get Treasury approval on.

  1.         Emma Lewell: It is a widely held view, repeated by many, that Russia could attack NATO territory by 2030. The Secretary of State went a bit further, indicating July 2029, but 15 of the major defence programmes, spanning all services, were assessed as “red” by NISTA, with completion largely being some time in the 2030s or completely unknown. Going through those programmes that are in “red”, how many are recoverable, how many need a fundamental reset and which should be scrapped?

Jeremy Pocklington: There are many parts to your question. We may need to talk about some specific programmes, some of which have national security implications, but I want to start with the premise of your question, which is about 2030.

You are right that 2030 is a very important planning horizon in the Department. The Defence Secretary has been very clear that the UK faces growing hostile acts from Russia, and that in the face of those threats we need to step up and take seriously our resilience as well as our defence.

We are not predicting a Russian attack in 2030, as the Committee knows; it is a planning assumption to increase our readiness. That is what the Department is doing through investment and the DIP.

  1.         Emma Lewell: That is what I was driving at, because there are 15 major programmes, spanning all three services, that will not be completed by that date.

Jeremy Pocklington: There are indeed 15 or 16 of 44, I think, that are in “red”. That is for a variety of reasons. My colleague Rupert leads on all but one of the programmes that are rated “red” in the National Armaments Director Group.

Rupert Pearce: Sure. It is my inheritance. The first thing I would say is that some of these programmes have been going for more than a decade, and they are among the most complex procurement programmes one could imagine. They are a significant proportion of the Government’s GMPP programmes. I want to set the context a bit. I am not ducking this—I will come back and look at any of the red programmes you want to look at—but, overall, they are disproportionate among our programmes in value terms. Numerically, we have somewhere between two and two and a half programmes in flight at any one moment. By and large, we are delivering most programmes to time, to budget and to requirements. The system is not broken. We are talking about the most challenging programmes that one can run—multi-decade programmes for very large platforms that are extremely complex and trying to keep us at the cutting edge of capability. We are pushing the boundaries, often in every area. The famous Ajax programme is a very good example of trying to get ourselves the world’s best recce strike vehicle and doing everything at once. It is a really tough gig.

I also want to give you context by talking about how we are doing when we benchmark against other large programmes. The numbers are not great in absolute terms, but when you look at the Bent Flyvbjerg dataset for large programmes, we are not terrible. On 2026-27 data, 66% of our large projects were delivered on budget or better. The market benchmark is 49%. When you look at cost and schedule, we are at 44% of programmes and the market benchmark is 8.5%. When you look at the fullest measure of success, which is on time, to budget and to requirements, we are at 42%. The benchmark data is 0.5%. One should take no pleasure from any of those numbers. They are pretty shocking to me, actually.

  1.         Emma Lewell: “Not terrible” is not “good”, is it?

Rupert Pearce: Correct. I am just trying to give a sense of perspective. This is a very hard thing to get right and do well. That is all I am trying to say. I do not think we should conclude that we are a lot worse than anybody else and that the system is broken. Can we do better? Yes. Are we trying to improve large procurements going forward? Absolutely. The creation of the National Armaments Director Group is central to that. I certainly hope that in five years’ time, when I come back to this august group and talk about the GMPP programmes, we do not have a slew of new programmes that are all red as well. We are trying to ensure that we do things better and in a more considered way. The list we have here of the 44 programmes—

  1.         Emma Lewell: The main ones I am interested in are the 15 major projects. What is the future of those? Are they recoverable? Do some of them need to be scrapped? Do some of them need a fundamental reset? You have been in post nearly a year. Some of these programmes were in trouble when you came into post, and they have remained in trouble while you have been in post.

Rupert Pearce: They have got slightly worse, actually.

  1.         Emma Lewell: Yes. Are they recoverable?

Rupert Pearce: Yes, they are.

  1.         Emma Lewell: All of them?

Rupert Pearce: Yes, all of them are recoverable. Red is not a statement of inevitable failure. The remedy for each programme is different. It could involve a reset, more money or dealing with very specific issues. We have absolutely not given up on any of these programmes.

Let’s talk about armoured cavalry, which happens to be at the top of the list but is also one of the biggest. You know that Ajax, as that programme is colloquially known, has been deeply troubled. We are on at least our second reset. There are lots of reasons for that. It is a very complex programme. Looking back, I do not think it was set up for success. What we need to do now is seize it and work through the various issues. The issues are ones of ensuring quality build. If you accept things that are poor quality, you inherit a lot of problems. We have to tighten the quality assurance. We need to complete a series of necessary capability drops.

We also need to realise that we have to operationalise the vehicle. One of the frailties in the system was that it kind of stopped when the vehicle was delivered out of the factory. For this to be operated safely and deliver its fightability, we have had to completely reinvent and reinvigorate the training and the onboarding of operators, which is where things were going wrong.

  1.         Emma Lewell: In terms of the ones that are recoverable, obviously the date will slip, so it will be even later than the 2030s, won’t it?

Rupert Pearce: Yes, it will. Generally, to fix these programmes, it will take time and money to get to where we need to be.

  1.         Emma Lewell: The point I am trying to make is that it will take even longer, so we will have less capability by the date we need to, and it will cost the taxpayer even more money because it will take longer to deliver.

Rupert Pearce: That is generally right, because we are in an inflationary environment, but it is not black and white. There are already many Ajaxes ready to be deployed this year, by way of example. As I look down this list—

  1.         Emma Lewell: Sorry to keep interrupting you, Rupert, but if we go through every single one of those 15 major programmes, the session will have ended and my colleagues will get very irritable with us. I do not know if it is worth potentially writing to the Committee with more detailed answers to my question, but in the time I have, I would like to know most whether you think that any of them should be scrapped.

Rupert Pearce: No. At this stage, we are not looking to scrap anything on the list. Obviously, we are mainly focused on the red. We do scrap programmes. We look at programmes all the time in terms of whether they have become unviable or whether our capability requirements have moved on, but this list are all things that are very important to our future capabilities. We are looking to solve the problems and get them out the door and into full capability as quickly as possible. That generally involves spending more money and taking more time to get it right. We are trying to minimise that as much as possible.

  1.         Emma Lewell: Why do you think it has got worse in the last year?

Rupert Pearce: I do not think it is anything particularly systemic. It is just numbers. It is not that things are getting worse in terms of the heuristics. The border between what is amber and what is red is quite slender, and some of this is quite subjective in terms of the way you look at things. We tend to be more negative and cautious, by definition. I think there are things that are red that could drift into amber quite easily, and things that are amber that could go green quite easily, but we are cautious, because that makes us very focused on remedy.

  1.         Emma Lewell: It is frustrating for us as a Committee, because procurement and delays to programmes have been a long-running theme—for as long as I can remember. The creation of the NAD was meant to drive improvement. As you have said this morning, things are not really improving.

Rupert Pearce: The NAD, I hope and believe, will materially improve the pace and quality of our procurement going forward. What we are talking about now are things that were greenlit as procurements anything up to 15 years ago. None of the things that are red were greenlit in the last year. That is why I talked about it as an inheritance. It is things that were done under previous regimes, structures and ways of working. I am not criticising that; I am just saying that some of these have been troubled programmes from inception. Now we are in the very gory and unglamorous business of blocking, tackling and fixing things. For most of these programmes, there is no one thing that you just do and everything is fine. They are very complex, challenged programmes. I am not saying that we will never have new programmes go red, because building frigates and next-generation armoured cavalry vehicles is a really tough, complex thing. External factors can come in over which you have no control. We are also—

Emma Lewell: There is frustration because we see other countries managing to do it a lot quicker than us. I could go on for ages, Chair, but I sense that you want to move on, so I will leave it there for now. If I could get a written response, that would be really helpful.

Rupert Pearce: Let me add that we offer the opportunity for you to come in and go deeper into a series of programmes, to really get under the hood of why these problems emerge and what we are doing about it. We are really happy to do that.

Chair: Definitely. I would like to place on record my thanks to both the NAD and the permanent secretary for the co-operation granted to the Committee, wherein we have been able to come into the Ministry of Defence for secret and classified briefings, including to go through the various major projects that my colleague just referred to. We have a couple of quick supplementary questions. Time is moving on fast, but you have elicited some interest.

  1.         Lincoln Jopp: Don’t get me wrong, Rupert: I want you to be wildly successful—I think you are a class act. I just want to knit together a couple of things you have said. You said that 44% of programmes are on cost and on schedule. You said, “we are not terrible.” You talked about improving “the pace and quality of our procurement”. But then you said something that I am really worried about. You said, “I do not think it is anything particularly systemic.” My experience in the MoD is this. You can call them heroic assumptions if you like, but other people would say that lies are simply told about how much things are going to cost and how quickly they are going to come, because if you did not tell those lies, you would not get them into the programme. Have you unearthed that that is the case in your retrospective look at your inheritance, and is that what you can change in order to be better and faster in the future?

Rupert Pearce: An unqualified yes, and it comes about from not matching resources to ambition. If you do not have the resources to deliver your ambition—if you are essentially over-procured—these kinds of games get played. These kinds of behaviours happen because they have to happen, so you are hoping something will turn up in the years to come.

One of the reasons for the DIP and one of the powers of it is that it is not just an equipment plan; it is a holistic look at the entirety of defence and where we are going. We are now going to the effort to take that financial settlement and bring it into balance, so that our resources do match our ambition and therefore you do not have to get into these systemic things—and they are systemic things; they are part of the system and part of the way people behave. My comment was really about the fact that people are not looking to overspend; people are not profligate with other people’s money in defence. I have not seen that. That does not mean that, when the pressure comes to do more for less, it is not a stimulus to get to herculean compound assumptions that are unlikely to land well down the road.

We have to root that out, and we have to stop it. We have to be ultra-realistic. It is not an easy game, but we need to be a lot more conservative about what things cost. That is why we now take not requirement sets but problem sets from MSHQ, and we look at the “should cost” and the options before presenting them back to MSHQ. I hope that will lead to better long-term thinking about what things really should cost.

Chair: We are going to come back to the impact of the NAD Group in a second, but I want to finish off on defence finance with Graeme Downie.

  1.         Graeme Downie: I want to pick up some elements around increasing private investment in defence finance in particular. Jeremy, does the Department have a target or an expectation for how much private finance it believes it can leverage over, say, a 10-year period?

Jeremy Pocklington: We do not have a specific target exactly along those lines. What we did say in the DIP—again, Rupert leads on this—is that we think private finance has a very important role to play in supporting and driving delivery. Most obviously, there is an important role in the supply chain as well, and also in ensuring that we can get the capabilities we need. That is why we committed to publish the defence finance strategy, which we are due to be publishing shortly.

Graeme Downie: Which is running late—very late.

Jeremy Pocklington: There has been a change of Government in the preceding period, so it is quite natural—

Graeme Downie: It was due to be published in early 2026.

Jeremy Pocklington: It is quite natural for some of these things to be reprofiled.

  1.         Graeme Downie: Was the initial publication date not early 2026?

Rupert Pearce: You are right, and it got delayed principally because the DIP got delayed. The DIP ran so close to the end of the parliamentary Session that we could not land the DFIS until after the holiday. Then we had a change of Government. We are looking to land the defence finance and investment strategy on 1 December at a defence investment summit in London.

  1.         Graeme Downie: Going back to the initial question, what is your ambition for the scale of the role that private finance can play in defence spending?

Rupert Pearce: I sincerely hope that we can bring billions of pounds-worth of private finance into our supply chain to help it grow and succeed.

  1.         Graeme Downie: Again, is there a way you can be more specific—either in percentage terms or with specific models you think can work, rather than just saying billions? Frankly, in defence, everything costs billions, so if you could not leverage billions, I would be concerned.

Rupert Pearce: Let me be clear. As the PUS just said, the principal reason we are deploying this strategy and looking to bring private capital into defence is to benefit our supply chain. It is not to benefit us directly, but our supply chain. We believe, having talked to the investment community, that defence has been underbanked for decades. It has not been an attractive area for investment for private capital, nor have we done everything we could have to make it more attractive. Now, through the SDR, it is clear that private capital in the UK is a strategic national asset and one that can be brought to bear to facilitate the delivery of deterrence as well as grow British defence companies.

  1.         Graeme Downie: Presumably, the delay of the DFIS and the process around the DIP have not built much confidence in the investor community.

Rupert Pearce: It is an analogue of the fact that the DIP was delayed as well. We have talked a lot in this Committee about the short-term damage that has been done by the delays in the DIP in terms of bringing those long-term demand signals.

  1.         Graeme Downie: How would you characterise the delay in the DIP and subsequently the DFIS? From your conversations with the investment community, how would you characterise the extent of the impact of that delay purely on the private investment goal?

Rupert Pearce: Non-material.

  1.         Graeme Downie: So in your mind, the investors are not bothered by the delay in the DIP and subsequently the DFIS?

Rupert Pearce: Not materially, no. They still see Britain as a wonderful place to invest in the defence and dual-use industry. There is a massive amount of capital looking to lean in and play its part in helping Britain deter its adversaries through the power of investment. They see British defence companies as extremely attractive. Our corporate governance, rule of law, innovation, technology base, and education and skills base all make the UK an extremely attractive place to invest, and defence is also an extremely attractive place to invest. They can see long-term growth potential and exit potential.

This year alone, MoD has been associated with the creation of four tech unicorns—companies that did not exist two years ago that are now valued at £1 billion or more. There is a real opportunity here for international investors to come into the UK and invest. We are seeing that pent-up demand, and some of it is already feeding into those tech unicorns and our supply chain.

  1.         Graeme Downie: Without pre-empting its publication on 1 December, will the DFIS have clear outlines of the kind of scale you are looking for and how you will ensure that that feeds down the supply chain effectively?

Rupert Pearce: The key is to unlock the flow of capital into defence-related companies small and large at every stage, from getting a bank account or overdraft all the way through to infrastructure capital, development capital, venture capital and specialist capital. Yes, it is very much a holistic look at making defence investable. I think the DFIS has about 50 policies that we are deploying holistically to create an environment in which our supply chain can gain access to funding; we want to be proactive in that.

  1.         Graeme Downie: To go back to some of the questions asked by colleagues earlier, when do you think that finance will have an impact? Is this something that has a short, medium or long-term impact, and how will we know if you have been successful?

Rupert Pearce: We will track the flows of capital into our supply chain. We will establish a whole series of strategic relationships with financial investment partners that are willing to lead the way. You will see this in a series of announcements on 1 December: some well-known names stepping up and saying, “I am going to be the strategic partner of MoD to make this happen.” We will see it in the speed with which defence companies are able to build new facilities and manufacture, the creation of new companies, the flow of innovation through National Armaments Defence Innovation and the creation of that innovation in capabilities. There is a whole series of metrics that we will look at it.

  1.         Graeme Downie: How will the DFIS, or more generally the NAD group, learn from some of the previous private partnership agreements like those with Annington Homes or AirTanker, which have been criticised by the Public Accounts Committee and the National Audit Office? What are those lessons? Going back to the discussions we had earlier, how are we making sure that those lessons from the past are genuinely being pulled through, and that we are not seeing wishful thinking about what can be achieved through private partnership?

Rupert Pearce: Now you are pivoting to another use of private capital, which when it is used directly in our programmes.

  1.             Graeme Downie: Is that something that you are intending to use as well, or are you looking to use a different shape and model?

Rupert Pearce: We are definitely looking to be open to that, if we can structure deals that deliver the kind of benefits you are talking about and do not leave us—

Jeremy Pocklington: I was going to come in to say that, for me, the lesson from Annington is that, if you are going to bring private capital into your core programme, you need to be absolutely sure that it is value for money in the long term, and that it is in the long-term interests of the Department and your mission.

Graeme Downie: I am slightly worried that that is a revelation.

Jeremy Pocklington: The challenge with the 1996 Annington deal, which I think is the one you are referring to, is that that prioritised up-front costs; it did not properly look at the whole-life costs and the long-term liabilities. Crucially, the Department was giving up control of an essential strategic asset for defence.

  1.         Graeme Downie: So you won’t be doing that in the DFIS?

Jeremy Pocklington: The lesson is that you need to keep those things in mind. Of course, we cannot repeat the mistakes that we made with that original 1996 deal.

Chair: Let us now move back to the work of the NAD group.

  1.         Ian Roome: The structure of the NAD group has been going for about 18 months, and Rupert, you have been the head of that for 12 months. What are the three most significant, measurable improvements that NAD has achieved, and what is the baseline in each case? Can you name three successes?

Rupert Pearce: There are three big areas of activity. The NAD group is organised to support the three pillars of the SDR: capability reinvigoration—procurement and delivering new capability for the armed forces; strengthening our defence industrial base so that it becomes a strategic warfighting asset; and bringing the power of innovation to bear on defence. Over the year that I have been in post, I think all those things have improved really meaningfully.

We benchmark against the SDR objectives and the defence industrial strategy objectives, so there are measurable things. For example, we have a target to raise our business with SMEs by 50% between now and the end of 2028, and we are now growing that. Our SME business was shrinking over the course of last year; it turned around and is growing again. That is encouraging, and we can see the glide path now to getting to grow that business by £2.5 billion a year.

Our business is interspersed with lots of metrics that we judge ourselves by. What would I call out as the big successes? Well, in capability development, the biggest and most foundational change is the creation of plans and portfolios. The new organisation that we have stood up, run by Admiral Tex Marshall, is where we will start to think differently about how we procure, seize the initiative as a professional procurement agency and bring in a coalition of the willing to move at faster pace with greater fidelity.

We have established that now: we have established the planning piece and the first four portfolios of a 13-portfolio set to look at our capabilities through a strategic lens and make better decisions strategically, thinking end-to-end and systemically. Those foundations are in place. I see the portfolios playing a major role in turning the DIP into a delivery plan, which has been great. I see the planning starting to work well.

Air Marshal Tim, on my left, is a fundamental component in that. He is the nexus by which MSHQ works with plans and portfolios to get that right. We have seen our first problem sets coming through; we are learning how to develop those really well together and asking, “What does good look like?” That will make a profound difference to the pace and quality of our procurement going forward, so that is what I would call out there.

In industry, I would simply call out the fact that the defence industrial joint partnership is really working. It is not just a talking shop. It is not just a place where you can meet a Minister on a Wednesday afternoon. It is a genuinely hard-working, delivery-oriented organisation where working groups are working powerfully around areas like supply chain resilience, regulatory reform, single source contract regulations, exports and so on. It has become a very practical organisation, and the conversations with industry have changed in the last year.

  1.         Ian Roome: On that point, Rupert, since taking the post, have you seen any major programme contracts we have signed that you would not have signed on those terms—in other words, contracts that have not really been a good deal for the MoD? Are you thinking, “Actually, we should not have signed these contracts. It’s going to cost more to get out of these contracts than it is to carry on with them.” In other words, are we learning from what we may have signed in the past?

Rupert Pearce: Yes. I hope so, and I believe so. We have some very honest, humble people—very professional and hard-working people—in my group. They are open to learning and keen to look at what has gone wrong with previous programmes, so that we do not repeat those mistakes. Mr Jopp talked earlier about culture, and he is right. There are aspects of our culture that we need to shift if we are going to be an organisation that learns. I am taking that very seriously.

  1.         Ian Roome: We understand that you have developed an objectives and key results framework to measure your impact. Will you share this with the Committee on a regular basis?

Rupert Pearce: Of course. I am happy to do that. I have worked on bringing what are called OKRs into commercial organisations for decades. It usually takes an organisation a couple of years to figure out how they work, because this is about moving the organisation from inputs that it controls to outputs, which are what actually matter but which the organisation does not always control.

That is a cultural shift. People have to learn how to do that. They have to learn how to look at the interdependencies. They have to look at what has to be true today for something to land six months later, and then work back from that. It is a big shift, and it is a shift that National Armaments is going through. We are not there yet, but I am beginning to see a much stronger outcome. People themselves are focusing on outcomes together.

Ian Roome: I have been speaking to people in industry, and they say that you are definitely the right guy for the job—pat on the back for that.

Rupert Pearce: Thank you.

  1.         Ian Roome: But they also suspect that, because of your experience before coming into this role, you are finding some things very frustrating. That comes round to what Mr Jopp was saying about culture. How are you going to ensure that that culture shift happens, so that it helps you with your objectives? I think you know what I am trying to say.

Rupert Pearce: I do. May I reassure you that I am not frustrated? I am invigorated by these challenges. The purpose of our organisation right now is incredibly important. That is our north star—that is why we are doing this. By the way, the looming potential crisis is what galvanises change. I know that when we do certain things, we can move at a different pace, with great agility. What we are doing in Ukraine, for example, is evidence that the same people who can take too long to order capabilities for ourselves can move much more quickly when it comes to Ukraine. We have to look at the lessons for us there.

Culture starts from the top, so I have to get my leadership team aligned culturally. I have to get them to buy into what we need to do—to the new behaviours—and then I need to get them to lead on that. It is very easy to talk about that, but we need to have quick wins. We need to show, when the hard decisions come along, that we can behave in a qualitatively different way. Then, we have to create incentives and manage people further down the chain of command, so that they are led consistently and respond in the right way.

When you look at how a system works, it is always intensely logical. There is no lack of logic about why people behave in ways we do not want them to. It is the system that creates the stimuli for them to behave that way. We have to change the system and change the incentives to put them in places of psychological safety, where they can behave in the way we want them to. That is a journey, and it is a journey we are on. I am already seeing things beginning to change.

  1.         Jesse Norman: Just on that last point, you are suggesting that Kindred is a model for how to speed things up for the rest of defence. Can you talk a little bit about how that would work?

Rupert Pearce: In some ways, but it is not the only way. For example, Commercial X has been an unqualified success, where we have done smaller £50 million or below—

  1.         Jesse Norman: That is something you inherited though, not a NAD thing, right?

Rupert Pearce: That is right. I call Commercial X a skunkworks; it is a testing programme—“Can we do things differently for certain types of procurement?” Commercial X has signed over 1,200 contracts over the last two or three years, and its average time to get from first contact to contract is 30 days. It is an incredible success story and not—

  1.         Jesse Norman: What is the average time to actual delivery?

Rupert Pearce: I do not have that number. It is a much more—

Jesse Norman: If you are judging by results, that is the one we really care about.

Rupert Pearce: Yes, you are absolutely right. One of the things we are trying to work on in procurement, as you know, Mr Norman, is that the period from first contact to contract can be extremely long—it is six years for major platforms.

  1.         Jesse Norman: Kindred, for you, is an exemplar of what is being done right.

Rupert Pearce: It is, and what Kindred did was lift the system off the backs of our procurement people and let them get on with it.

  1.         Jesse Norman: Earlier, you spoke about Ajax and you said that you do not want to criticise work that has been done before. Why not? You might not want to do that publicly, but it seems to me that you need to be intensely critical of what has happened before, because, otherwise, how will you change the incentives and the culture that you are banging on about as being the crucial things to do differently?

Rupert Pearce: You are right—absolutely. I do not want to do that publicly, because they did the best they could in the environment in which they were making decisions. It is very facile to use 20/20 hindsight to go back and criticise. Do we want to learn? We do 100%.

  1.         Jesse Norman: What kinds of incentive changes will you be putting in place to motivate the behaviour you want that perhaps were not being put in place before?

Rupert Pearce: First, we need to get better at learning from things when they go wrong.

Jesse Norman: So, wash-ups.

Rupert Pearce: Exactly. Deep dives—

Jesse Norman: Proper deep dives within the planning horizon so you can actually see what has happened.

Rupert Pearce: One of the things we need to address culturally is a recognition that people can fail—we can fail.

Jesse Norman: In fact, it can be glorious to fail—in a funny way. It is not something anyone likes, but if you are learning effectively, it can actually be quite a good thing.

Rupert Pearce: Ideally, fail fast, learn, fix, move on, and then you become a better organisation. Our fear of failure is such that we take a totally risk-averse approach to everything we do. That slows us down. The tools we use to eliminate risk do not usually work. Risk usually comes back to haunt you, because you don’t control what you don’t control. The fear of failure culturally drives an environment where people do not want to be associated with something that does fail, and they do not want to admit to failure, so they keep banging their head against something when failure is looming. That is not good.

  1.         Jesse Norman: You need to distinguish between good failure and bad failure, and you need to reward the right kind.

Rupert Pearce: We also need honest conversations about something that is not going well, and not to fear it, but to bring people—

  1.         Jesse Norman: What about not promoting people who have had obvious failures or keeping people in the job so they can maintain some continuity in achieving an outcome you want?

Rupert Pearce: I agree. At first blush, I would say that if people have not failed, I am a bit concerned, because—

Jesse Norman: They are not testing the envelope.

Rupert Pearce: That, and also, they probably have failed, but they have not actually learned from it, because they have tried to escape it.

  1.         Jesse Norman: That is very interesting, thank you. You will be aware that the inability to get bank accounts for defence businesses is a really severe problem, especially with smaller companies. Can you talk a little bit about which banks you are working with or what you are doing to stimulate that process? That is a real problem.

Rupert Pearce: You are absolutely right. It is one of the foundations of the DFIS to get right. We will end the debanking of defence companies, particularly smaller companies.

  1.         Jesse Norman: How?

Rupert Pearce: By bringing a number of clearing banks into the market, with products specifically designed for smaller defence companies.

  1.         Jesse Norman: And faster processes by which they can set up accounts?

Rupert Pearce: Exactly. That will be one thing we are confident to be able to announce on 1 December.

  1.         Jesse Norman: That is very helpful. On under-banking, venture capital is not a substitute for sales; if you get venture capital early, it consumes your business, because you cannot build fast enough to discharge the banker’s requirements. The thing that really drives success on the financing side is consistency of contracting. Do you recognise that? Is that something that you build into the way you think about it? How are you doing that?

Rupert Pearce: Yes—100%. Our innovation engine starts bringing companies and their technologies through pre-revenue. The thing that is really valuable there is that we deliver product-market fit for those young companies. Most young companies looking for venture capital have that nasty moment when they take their whiteboard expression of what a customer will want and why their technology is great to the real customer and find that it is not quite a good fit. That is where a lot of companies die. Our advantage is that we are a development customer, so we can get that product-market fit. Then, when that is done, we are looking for funding against our commitment as a customer.

  1.         Jesse Norman: Thanks. Which are the four tech businesses that have become unicorns?

Rupert Pearce: UForce is one and Cambridge Aerospace is another, as is Isembard, but I am drawing a blank on the fourth one.

  1.         Jesse Norman: Three out of four is pretty good—well recalled. We have had a lot of pushback from businesses saying that the demand signal is still way below what it should be in terms of clarity and consistency. How are you fixing that?

Rupert Pearce: We are fixing it by bringing the delivery plan for the DIP to industry. They have already had a couple of goes at it. We have been sharing it with them, evolving it with them and iterating it with them, so that they become partners in the delivery of these programmes quarter after quarter. We are already signing six contracts a week, and have done since the DIP went out the door, so I think we have had nearly 400 contracts since then, worth about £3 billion in aggregate. So we are not standing still, but we do need to accelerate now and involve industry more.

  1.         Jesse Norman: It feels like the Defence Office for Small Business Growth is short on staffing, capability and outreach. Is that a fair judgment?

Rupert Pearce: That is a fair judgment. We are growing that—

Jesse Norman: I mean, why is that and what can you do about it?

Rupert Pearce: We started small to make sure that it worked. This is a new thing: it is a largely electronic interface between us and small businesses. We also wanted to establish regional clusters and ecosystems that we could work with, and then have workshops. We have been evolving it, growing it and feeding staff into it, rather than going big in one go. We are getting there. The quality of conversations with SMEs has transformed in the last year.

Jesse Norman: I would love some evidence on that at some point, if you could provide it.

Rupert Pearce: Sure.

  1.         Jesse Norman: The final thing is about security clearances; there is obviously a serious issue for smaller firms that may be using intermediaries to get security clearances. Is that something you are aware of? Is it a worry for you? There is also a general question about security clearances: how many there are, who they are going to, how they are validated and whether they are at the right level. Is that an issue that you think about?

Rupert Pearce: Yes, I am aware of it; I am concerned about it. That is an example of things changing within central Government and having an adverse impact that we need to fix, and we are getting after it.

Jesse Norman: What was it that had the adverse impact?

Rupert Pearce: Central Government not being willing to rely on intermediaries to sustain clearances. We have to reset that and either make sure that central Government delivers it directly or that we refresh the organisations that can hold clearances.

  1.         Jesse Norman: If the span of private sector organisations that you are trying to work with is going to grow as much as you need it to, to feed the change in the industrial strategy that you are talking about, there will have to be a—

Rupert Pearce: The system is going to have to scale for that.

Jesse Norman: Significantly, yes.

Rupert Pearce: Plus, I want to be able to put us in an environment where we can do more, particularly with smaller companies, without their having to have clearances. In other words, we can create environments in which they can migrate towards those clearances.

  1.         Jesse Norman: This is a constituency matter, I am afraid, but if we have small businesses that are not able to make any headway for some reason, can we refer them to your office?

Rupert Pearce: Of course, absolutely.

Jesse Norman: That is very helpful; thank you very much.

Chair: Let’s move on to readiness and capability aspects, starting with Mike Martin.

  1.         Mike Martin: Thanks, Chair. I just want to pick up on something else first. It is interesting that there has almost been a mantra this morning that procurement is complex and, therefore, we have these issues with procurement—fair enough.

Let’s have a look at Kindred: Mr Pearce, you said that Kindred is really an exemplar of how it should be done. I guess one of the reasons for that is simplicity, and we are just trying to do things more quickly—

Rupert Pearce: Well, there is no Ajax procurement in Kindred; it is a very different type of animal.

Mike Martin: Right. I am sure that you have all read the investigation in the Financial Times this morning. That relates to the procurement of explosives, which are pretty simple: you just buy explosives. Are you aware of what I am talking about?

Rupert Pearce: I am not.

Mike Martin: Mr Pocklington, are you aware of it?

Jeremy Pocklington: I haven’t seen that.

  1.         Mike Martin: This is fascinating. This is going to be fun. For the purposes of this story, there are two types of explosive. One has a compound called RDX in it, and the other does not. The one with RDX in it is C4. It is a better explosive, and it is about twice the price of non-RDX explosives. It is less volatile, it has a stronger blast and all the rest of it.

Now, the MoD in 2023—Kindred, in fact—signed a bunch of contracts to buy RDX-containing explosives, and a bit of a discrepancy has arisen, because it turns out that the explosives that were shipped to the MoD did not contain RDX. They were cheaper and more volatile, with less blast, and the MoD has known throughout this process, because it tested the explosives when they first arrived, that they were not in fact what it was buying. The FT is characterising this as the MoD spending tens of millions of pounds, over many years, on fake explosives. I was going to ask why the MoD was paying almost double for fake explosives, but all of you are claiming not to know anything about this story, so you cannot answer that?

Rupert Pearce: No, I know nothing.

  1.         Mike Martin: Okay. Given that this went on for multiple years, that the MoD knew that the explosives did not contain RDX yet still continued to purchase them, and that hundreds of tonnes of those explosives are going to support our allies in Ukraine, it does seem a bit odd, wouldn’t you say?

Rupert Pearce: On the facts that you have just lobbed at me, yes. It sounds like fraud.

  1.         Mike Martin: “It sounds like fraud”? This is your direct responsibility, Rupert, and Mr Pocklington’s as well, as the principal accounting officer. Mr Pocklington, if it is found that there is fraud and corruption in this case—

Jeremy Pocklington: Obviously, before we go any further, I think you should give us time to investigate the issue that you have raised. I can see that it is now in the FT, but we have not had a chance to brief ourselves properly on that issue. We will be very happy to write to you in more detail, but on the principle, of course, yes, we take all allegations of fraud very seriously in the Department.

Rupert Pearce: More than that, we have upped the ante on anti-fraud work and anti-mistake work as well, with investments in technology to get after that.

  1.         Mike Martin: There are a couple of other angles that I would like to put to you, if that is okay. The FT has been corresponding with the MoD about this for weeks—standard journalistic practice, offering you a chance to comment, a right of reply—so I do find it quite extraordinary that neither of you knows about this.

Rupert Pearce: So do I. You are not alone.

  1.         Mike Martin: I find it absolutely extraordinary. It turns out that the information that was given on background to the FT journalists was briefed to the London-based libel lawyers of the US arms dealer who was selling these explosives, and those London libel lawyers then threatened the FT journalist with personal liability. This is a SLAPP—a strategic lawsuit against public participation—against the FT journalist, Mr Johnson. This is a SLAPP aided—I have seen screenshots—by the Ministry of Defence against a British journalist.

Rupert Pearce: Hang on: what do you mean by “aided” by the MoD?

Mike Martin: Because the MoD briefed the libel lawyers on the conversations on background that it had had with the journalist, and that information was then used by the libel lawyers to claim—get this; this is mad stuff—that the British journalist, Mr Johnson, had blackmailed the MoD into making a false statement that the explosives that the MoD had did not contain RDX, whereas Tripwire, the arms dealer, did in fact claim that they had RDX.

Throughout, we have had a discrepancy between what the arms dealer said—that these are expensive, high-end, RDX-containing explosives—and what the MoD has said throughout: “They did not contain RDX. We’ve tested it. They never were meant to,” despite the fact that the MoD signed contracts—[Interruption.] Please let me finish. The MoD signed contracts saying that they did contain RDX. The way out of that, it appears, was that the MoD briefed the London-based libel lawyers to threaten—I am not saying that was the MoD’s intent, but the result of that briefing was that the British journalist was threatened with personal liability for that story. Do we think that is acceptable behaviour?

Rupert Pearce: I know precisely nothing about any of this. I did not read the FT this morning because I was giving a talk in an Anglo-Norwegian industrial collaboration meeting, so I missed it. I apologise for that. I am not even aware of this issue. But internally—

  1.         Mike Martin: But is that acceptable behaviour?

Rupert Pearce: From what you have described, of course not.

  1.         Mike Martin: Who would have to approve that? If neither of you is aware of it, who approved this?

Rupert Pearce: I have no idea; otherwise, I would be aware of it. All I can say is that it sounds—

  1.         Chair: Permanent Secretary, it is striking that both of you are saying that you are not aware of it. I have been aware of it for several weeks. The FT, I know, have contacted not only my colleague Mike Martin, but me—

Mike Martin: And the MoD.

Chair: They have contacted the Ministry of Defence—

Rupert Pearce: I don’t know who they contacted at the MoD—that is all I can say.

Mike Martin: The press office.

Rupert Pearce: Well, the press office didn’t contact me. It sounds as though they didn’t contact Jeremy.

Jeremy Pocklington: No.

Rupert Pearce: We are two members of the Quad. If this were sufficiently serious, you would think the FT would pick up the phone to one of the members of the Quad and say, “Rupert, Jeremy, what gives?” They didn’t.

  1.         Chair: Can we have the papers on this—the correspondence that the journalist had with the Ministry of Defence? I think it would be good for the Committee to have those, because—

Rupert Pearce: Of course. I am not trying to hide anything here. I am deeply concerned by what you just said.

  1.         Mike Martin: I am sure you are. Mr Pocklington, I think it is appropriate to have an investigation into this. Will you publish the correspondence and will you have an independent investigation?

Jeremy Pocklington: Let me look into the issue. Of course, if there are allegations that need to be investigated, I will ensure that that happens. I do not think I can go—

  1.         Mike Martin: By whom?

Jeremy Pocklington: I do not think I can go further in this hearing right now, Mr Martin, until I know more of the detail. That would be the appropriate thing to do, but of course I will let you know what action we are taking.

  1.         Mike Martin: With your permission, Chair, I want to put one further thing to the witnesses. When procuring explosives from the United States to send to our allies in Ukraine, it will have been necessary for the Ministry of Defence to support lots of arms export applications from the United States—submissions to the DDTC at the State Department—including signing end-user certificates, because we are buying these explosives and so we need to certify who is going to be using them. The MoD maintains its position that the explosives did not have RDX in them: “Nothing to see here, guv—that wasn’t even what we were buying.” That is the MoD's position in the FT article. So I can take it as read, can I, that on any end-user certificates signed by MoD officials, the explosive listed will be an explosive that does not contain RDX?

Rupert Pearce: I have told you that I know nothing about this, so how can I answer your question?

  1.         Mike Martin: Well, should that be the case, then?

Rupert Pearce: The short answer is I don’t know. It would have been nice if someone on this Committee had picked up the phone to someone from the Quad to verify the situation. We just don’t know.

Mike Martin: It is standard journalistic practice that your press office—

Rupert Pearce: I understand that—

  1.         Chair: Mr Pearce, we didn’t need to pick the phone up to anybody, because the journalist from the FT had already been in correspondence with the Ministry of Defence. That is why we are asking for those papers to be published and to be provided to us, so that we can try to get to the bottom of this.

Rupert Pearce: And I will give you every assistance to do that. I want to get to the bottom of it now as well, just as much as Jeremy does, and we will do that. It does seem extraordinary, though, as you have said, that at least two members of the Quad were completely unaware of this. This did not percolate up to us either in terms of it being an issue inside the MoD or something that is the subject of what sounds like a really important journalistic investigation.

  1.         Chair: It is quite astounding, National Armaments Director, that when such serious allegations are being made—as my colleague Mike Martin has said, if we are delivering equipment to Ukraine, we are talking about end-user certificates and so on—nobody in the Ministry of Defence has escalated that to members of the Quad. Anyway, we look forward to those papers. Given the lack of time, we have to move on, but I look forward to those papers being published so that we can look into them.

Let me move on to another key aspect. The defence investment plan referred to taking hard decisions to stop doing things that were deemed no longer relevant. We are talking about various things, such as abandoning the Type 32 and Type 83 warship concepts, the early retirement of the Shadow R1 aircraft and the cancelling of the Royal Marines multi-role strike ship—to name but a few. Permanent Secretary, how much funding was released for reinvestment as a result of those measures?

Jeremy Pocklington: I do not think that is conceptually the way we would look at it.

  1.         Chair: How would you look at it?

Jeremy Pocklington: Those programmes were at a different stage of development. Some of the programmes we stopped were funded, which does release a saving, and others had not yet been funded, including some programmes that had been started under a previous Administration, in which case we were avoiding a pressure in the programme. I would prefer to look at this in the round in the overall investment plan we published in June—that is the way we look at things, rather than saying that the investments took off x.

  1.         Chair: I am just referring to what was said in the defence investment plan. The question is about funding: how much funding was released for reinvestment on account of the measures taken?

Jeremy Pocklington: I would repeat my answer, which is that it is not possible to identify a single number that is released, because these programmes have a different status. You need to look at it in the round of the overall plan—if you like, the reset of the Department’s programme that was done at the time of the DIP publication.

  1.         Chair: So we are looking at lots of measures that are supposed to be saving us money, but we do not quite have the numbers down.

If I can come to your good self, Air Marshal, how is cutting the Army’s collective training programme compatible with being ready for war within 1,000 days, which the Defence Secretary and other members of the Government have been at pains to explain to the nation?

Air Marshal Jones: The Army is conducting a lot of training. In fact, the Army, Navy and Air Force continue to conduct training across thousands of people every week. If you go out to exercise training areas across the UK this week, you will find thousands of troops training. We have conducted numerous exercises this year: Rhino Storm, Arrcade Strike, Iron Storm, Swift Response, Austere Wolf, Rhino Bizz, Saber Junction, Haraka Storm, Avenger Triad—thousands of troops have been involved in all these exercises.

We deployed Operation Firecrest, the carrier strike group, with NATO partner nations into the north Atlantic this year. We conducted Arctic Sentry, which was enhanced air policing, with partners in the Arctic and Iceland. We conducted Exercise Neptune Strike this year, which was rehearsing long-range F-35 strike missions, and we have just returned from Exercise Koalicja, which has been a practical test of readiness rehearsing the—

  1.         Chair: I am aware of all those exercises you are describing, but the question remains about the Army’s collective training programme. Do you feel that is no longer suitable? Is that why you have felt that will actually make us more war-ready within 1,000 days?

Air Marshal Jones: We have a very active collective training programme for the Army, including 66 overseas exercises going ahead this year. We have also invested £2 billion in the collective training transformation programme for the Army, which brings together synthetic and live training through integrated digitalised technology that allows us to enhance the live training of our troops. That will see an improvement to training for 60,000 soldiers a year—it is a £2 billion investment. So to your point on collective training, that is where we are spending a lot of our new money.

It is quite normal for us to review the training programme every year, and it is absolutely a reminder of why the running costs aspect of our defence budget is so important. We spend a lot of time talking about the capital investments, the equipment and the platforms, but the running costs element of the defence budget is really important for that activity and training.

  1.         Chair: It is good that you should refer to finance. If we could come to your good self, DG Finance, how much money was actually saved for the MoD as a result of this hard decision?

Aneen Blackmore: Are you referring to—

Chair: The cutting of the Army’s collective training programme.

Aneen Blackmore: As Tim set out, as we were going through this year, we and MSHQ were planning a review of the most effective set of training that we could put in place, looking at the threats and the skills that we needed to develop. We regularly review that and address it.

  1.         Chair: So no money was saved; it was just a case of reconfiguring.

Aneen Blackmore: As Jeremy referred to, clearly, as we went through both the DIP and in-year management—we are regularly reviewing our position. There are ups and downs on thousands of lines. We are responding to emerging threats and changes in programmes. Sometimes costs go up and sometimes they go down. We are ensuring that we are responding to that—not always financially. Clearly, we always need a financial balance that we are able to assure, but there are a number of items that arise that we are needing to address.

Chair: I believe my colleague Lincoln Jopp wants to come in on this quickly.

  1.         Lincoln Jopp: Air Marshal, you were asked by the Chair why the decision was taken to cut Army collective training. If I may say so, you became quite evasive and listed a load of things that were happening. The cat is out of the bag; the Secretary of State said when he came in front of us, “I have taken decisions to stop doing some things this year. In some cases, they have been higher profile, and we have taken some criticism.”

Why do you not just answer the Chair's question? Why was the decision taken to cut Army collective training? If you say, “Because it was going to save the amount of money we needed to save,” maybe the finance director could answer that question with, “Well, it saved this amount of money and we needed it,” but at the moment, people are throwing smoke.

Air Marshal Jones: We have to live within our means; that is absolutely true. We always knew that we would have to prioritise hard across our training and that is what we have done. We have focused the training budget on the highest priority exercises and the high readiness units. The readiness of the armed forces has not been affected by the way we have been scheduling the training plan for this year. We want all of our training to go ahead, of course we do, but not all of our training is the highest priority. Where we live within our means, it is quite normal for us to reschedule training that is a lower priority and come back to it at a later date.

The last thing we want is to have soldiers, aviators and sailors who are expecting to go on exercise to not go on exercises. We are not in the business of that. Neither do we want to see training come under pressure where it might affect readiness. We have to look ahead at that programme and prioritise it, and—you are absolutely right—that means that some of that training has to be deprioritised. It would be disingenuous of me to say to this Committee that that does not involve some hard decisions and some hard priority calls. For the time being, we think we are managing it, but it is a reminder—to take you up on the spirit of your question—of the importance of the running costs element of the defence budget.

The Committee will know that over time the balance between the capital and the resource allocation of the defence budget has changed. Twenty years ago, 80% of the defence budget was running costs and 20% was capital. Now, it is about 60:40, and if we look forward to a few years’ time, it will be about 50:50. In terms of running costs, that is paying for a lot of things. It is paying for salaries, which are going up. You heard Jeremy say earlier how fuel costs have gone up. At one stage this year, fuel costs were 88% higher than they were last year. That all conspires to bring pressure on the running costs budget, and of course that is the budget that activity and training comes from. It does involve making hard priority calls. We do not want to deprioritise any of our training, of course we don’t, but—

  1.         Chair: Air Marshal, further to what Mr Jopp just said, isn’t the real nub of the problem that the profile for RDEL has not increased in essence since 2010, while CDEL has been increasing? Therefore, we have less and less to spend proportionately on our troops and those who are actually operating those pieces of kit. That is why the training budget and other aspects do not seem to be given priority.

Air Marshal Jones: It is in the context, of course, of a rising budget. Where we see the RDEL budget coming in, that allows us to service the highest priorities and focus on the readiness that we need. It is absolutely an ongoing challenge that we continue to look at, and where we see the pressures bearing down on the RDEL budget, we have to manage those.

As Jeremy has explained, some of those are factors that are outwith our control. Fuel inflation is a great example. These variations can have a huge impact on the managing of a very tight budget. Therefore, we have to take that year by year and manage it as we can. For the time being, we think we are managing it, but it would be disingenuous of me to say to this Committee that this is not a challenging area. We will have to keep coming back to that and looking again at those decisions.

  1.         Chair: We want to delve into the issue of RDEL versus CDEL in more detail but, given the lack of time, I want to move on to your good self, Permanent Secretary, and the defence housing strategy. That committed £9 billion to the upgrade of more than 40,000 military homes, but you have since deferred at least £800 million from this Parliament to the next. Some of us have raised this issue previously. How many families will have their home’s refurbishment delayed as a result of that decision?

Jeremy Pocklington: You are correct. The previous Defence Secretary took that decision, in the defence investment plan, to delay the expenditure on the Defence Housing Service. It maintained the overall ambition of £9.2 billion over 10 years, but that smaller amount of money of just under £1 billion was moved from this Parliament to the next. We have confirmed that very openly and transparently.

The Defence Housing Service still has several billion pounds to spend this year. It is now developing the detailed and specific plans for what it will deliver between now and the end of this Parliament. It is due to publish its strategy, setting out what it will do, at some point next financial year. That will set out in more detail what it will spend on.

  1.         Chair: To answer the question, then, how many families will have their home’s refurbishment delayed as a result?

Jeremy Pocklington: It will have an impact on the profile of build. We are still establishing the Defence Housing Service and the detailed strategy and delivery plan alongside it, so I do not think I can give you a precise number, but of course it is delaying the delivery of our housing strategy.

  1.         Chair: Let us move on to the national armaments director, then. Further to what my colleague Mr Roome asked earlier, how much additional funding have you allocated for the implementation of the Elphicke Ross review of the single living accommodation estate?

Rupert Pearce: I will have to write to you on that; I do not have that number in my head.

  1.    Chair: Right. That is part of your core areas of work, so I was expecting that. As I said earlier, on such central issues, members of the panel have to be briefed so that the Committee can have the required information. I would expect that sort of question to be answered.

Jeremy Pocklington: On the Elphicke review, the Department has said that we welcome her report. The issues she has identified around quality, standards, maintenance and the demand signal are important ones that we need to address. The Government will set out its response in the next few months, in due course. It would be wrong for me—

  1.    Chair: So you do not know how much extra at the moment.

Jeremy Pocklington: It would be wrong for me to pre-empt that response. While the Deputy Chief of the Air Staff is leading that across Defence, of course this is being managed—a team has been pulled together—within existing resources to ensure that we are able to prepare an appropriate response to Natalie Elphicke’s important report.

  1.    Chair: So at present you do not have the funding answer. National Armaments Director, within that review there was a recommendation around meeting the decent SLA standard by 2032. Can you commit to the Committee that you will meet that?

Rupert Pearce: Yes. That is a fundamental part of our defence housing strategy, which applies to both family homes and single living accommodation.

Chair: Brilliant. Thank you. It is good to have that on the record. Mr Roome, do you want to come back in?

  1.    Ian Roome: Yes. Having nice shiny kit and capabilities is all well and good, but we need the personnel to operate it, and not giving them somewhere decent to live is not acceptable. Have you all read the report, which came out two weeks ago?

Jeremy Pocklington: I have read it.

  1.    Ian Roome: And what did you think of it?

Jeremy Pocklington: I thought it was a very good report. I alluded to that in my previous response. As you may know, I worked on housing in previous roles in the civil service. I think she is right to have lit on the fundamental central importance of housing and high-quality SLA accommodation, and the challenges of getting after maintenance and having clarity on standards, including through the decent SLA standard. Those things are quite hard to deliver in practice, and Natalie has given us a clue about how we might do that.

The report highlights the importance of ensuring that not just the rooms but the communal areas are of an appropriate quality. There is a need for Ministry of Defence and MSHQ colleagues to provide a clearer demand signal. It was a very useful report, and I am grateful to Natalie, who I have worked with over many years, for her work on it. Of course, she is also the founding chair of the Defence Housing Service, and I regularly meet her to talk about that.

  1.    Ian Roome: I must say that parliamentarians sometimes do not get this right. I lived in single accommodation when I served in the RAF. Everybody presumes that it is for fresh recruits and single people, but it isn’t; SLA is also for married people who choose to work away in the week. They live in SLA, rather than stay where they are. I just want to put that on the record.

Jeremy Pocklington: I am aware of that. When I visit bases, I talk to people and try to understand their lived experience. I was recently up in RAF Coningsby. I stayed in the SLA, and I met people who use that accommodation, including people who live away from their families during the week, so I am aware of that.

  1.    Mike Martin: Since 2021-22, the MoD’s spending has increased by about £16 billion, which is great—we all welcome that. Could you list the tangible improvements that that funding has brought to military readiness and capability?

Air Marshal Jones: We are starting from the position of having armed forces that have been configured for specific kinds of conflict: wars of intervention, and what you might call small and medium-scale crisis response, which are demanding in their own way. My career has been defined by operations where you have large iron mountains of equipment, slow decision-making loops and low levels of attrition. That is not the world that we are going into.

  1.    Mike Martin: It is not a world in which you have a carrier, for instance.

Air Marshal Jones: It is a world in which a lot of our extant capabilities are not obsolete, as such, but we require a blend of the crewed and the uncrewed, and traditional and emerging technology. What we see, therefore, in terms of how the force plan is developing out of the defence investment plan, is the changing character of that force. We have already started with some of the hardy perennials that you will be familiar with: the shipbuilding programme, Type 26 and Type 31—

  1.    Mike Martin: Have we had any increase in capability and readiness as a result of that £16 billion uplift?

Air Marshal Jones: Yes, we have seen huge investment into our fast jet fleet, for example. I think the Typhoon is a great success story. It has seen action in operations around the world. I was in the middle east for a year in 2020, and I saw for myself what that platform was doing. It is hugely effective on operations. The investment that went into that, in readiness terms, saw a material increase in how that platform was being utilised on operations. Likewise, in terms of how we invest in the Navy, we are now taking very seriously the investment that is needed in order to underpin ship and submarine capability.

  1.    Mike Martin: The readiness in the Navy is really poor, isn’t it? We have no submarines at sea at the moment, and for surface, we might have two ships out of 11. Readiness is really poor—would you not agree?

Air Marshal Jones: I will not comment on the specific readiness levels of the Navy, as you will probably understand. We have had classified sessions, when the Committee, hopefully, has benefited from some of the briefings that we have been able to give. Let me just say that the Royal Navy and all the partners around it do a brilliant job in fielding those ships and submarines at sea. They are active, they are effective and they are doing a fantastic job—but it is no secret that they are old. Type 23 has done a fantastic job, but it is an old ship. Therefore, to your point about where the money has gone, the investment has in part gone to renewing the Royal Navy, with Type 26 and Type 31.

  1.    Mike Martin: This is an argument that we had earlier—that is a capital spend that will deliver in 2035, say, or beyond 2030, and yet we have this 1,000-day planning assumption, intelligence assessment, call it what you like. That is how we are trying to organise ourselves: we have to be ready for war in 11 days, and yet most of our money is going on capital expenditure that will deliver beyond 2030.

Air Marshal Jones: The capital expenditure is going on platforms that will deliver post 2030. When we were looking at the defence investment plan, a lot of thought went into getting that balance right. As you can imagine, 2030 is not a destination, because if we were to plan on the war being in 2030, the war would be in 2031, wouldn’t it?

Mike Martin: Or in 2029.

Air Marshal Jones: Well, indeed. Ultimately, this is the dilemma that any armed forces have in planning their future: the balance between readiness and modernisation, and getting the optimum balance.

  1.    Mike Martin: Could you reduce risk by taking, say, 5% of that CDEL budget and putting it in the RDEL budget to generate what we have spoken about—collective training, flying hours, munitions, exercises, all that kind of stuff—which would increase our readiness and deterrence, and might even push that 1,000 days further out to buy us some time? Would that be an interesting thing to consider?

Air Marshal Jones: In the DIP, the logic we used was: “Where do we spend the marginal pound in order to add the most value to NATO and to what NATO is asking from us, and how do we spend the money on the things that we know alter Russia’s risk calculation?” Munitions is a good example of that. We had a large amount of money set aside for the Storm Shadow new build. That was a really tough decision, but it was a trade-off that we thought was necessary to make. Far too great a proportion of our defence budget was being spent on high-end, complex munitions, which are important in their own right—Storm Shadow is a fantastically capable piece of equipment, which we will continue to use—but we wanted to spend the money that we would otherwise have spent on the Storm Shadow new build on low-cost, mass munitions: the kind of things that you see being fielded in Ukraine and can be manufactured in this country.

  1.    Mike Martin: I am sorry to cut across you, but time is short. Your analysis makes complete sense—we are going to spend the marginal pound on stuff that NATO wants and that fits into its force plan, of course—but the “when” is the thing that is missing from your analysis. We could deliver the best possible thing for NATO, but if it delivers after the point that we have failed to deter Russia, that is a problem.

Mr Pearce, the DIP was clear what it did not want: we “must ensure our Armed Forces are not left with old, outdated kit”. Are you concerned that so much funding—the vast majority of it—is allocated to legacy kit? The carriers are a great example. The Navy is so stripped back that if you want to put a carrier to sea, that is basically the whole Navy, in terms of producing the carrier group. We might even have to borrow some platforms from an allied country to put the carrier to sea. There are also all sorts of questions about whether the carriers have the utility that they used to have, when we are not in an expeditionary war, but fighting a peer adversary with hypersonic, sea-skimming missiles, in a world of unmanned drones and all the rest of it. Given that example, does it not concern you that we are maybe not allocating that funding in the right way?

Rupert Pearce: I am naturally concerned about all of these moving pieces of the system, but I take enormous comfort from the fact that Tim, on my left, and military strategic headquarters have looked at all of these puts and takes and examined what should be deprioritised and cancelled, and what platforms should be stopped to free up resource for other more important tasks, and those decisions are taken with great skill and professionalism—and holistically. I am the recipient of that in terms of what I go-get in national armaments in terms of new procurements and new capabilities, and how I get to move my resource around in terms of in-life support for a platform.

Plenty of platforms have been retired in recent years, which Air Marshal Tim just gave an example of. I am not concerned that we are making the wrong decisions, but I am concerned that these continue to be hard decisions and hard trades to make against a risk analysis that says we have to be ready to fight in 2030. To do that, we also have to provide new capabilities to our armed forces.

Air Marshal Jones: And it is not binary between the traditional and the new platforms. The most successful armed forces we see are the ones that are fuelling both together, and it is how you marry the two. If you look at where the money went when we came up with the plan, there is £5 billion on autonomy, £11 billion on munitions and £7.3 billion on digital targeting and digital backbone. Underwater warfare, including a huge amount of autonomy, is £1.2 billion. And there are the extant programmes like Type 26. The First Sea Lord described, along with the head of the British Army and the Chief of the Air Staff, how you marry up those two things. How we will fight is changing, and it is how you get the blend of those two things together that makes for the effective force of the future.

  1.    Mike Martin: I agree that it is not zero-sum, although it is zero-sum in the sense that you have only got so much money and you have to spend it. It is zero-sum in that sense. What you have described is a kind of classic MoD approach to stuff where we are not salami slicing, because we are growing now and not shrinking, but it is penny packeting—it is the opposite. We spread our bets everywhere.

Very briefly—I just need a one or two-sentence answer, Air Marshall—would you say that we hold quite a lot of risk at the moment with that approach?

Air Marshal Jones: With the approach to—

Mike Martin: Spreading our bets quite thinly and trying to generate full spectrum military capability on budgets that—Mr Pearce made the point earlier about vision and resources: the SDR, the DIP, the vision and the resources still have not been brought together. Do you think that we hold quite a lot of risk in the approach and choices that we are making at the moment?

Air Marshal Jones: I think we have a good plan. As long as we deliver the defence investment plan, we have got a plan that looks very effective. I will give you an example. Last week we had the national military reps from across the whole of NATO in the UK. We gave them a three-day briefing. The MilReps go on a tour and get briefings from all sorts of countries. We gave them a readout of what we are doing: translating the defence investment plan into reality, the digital backbone, the hybrid Navy and what the Army’s plans are and the RAF on CCAs. One of the national military reps said to us afterwards that in five years of doing these tours, it is the best one he has seen. These are people who are tough to please. He wasn’t saying it in front of a camera. He wasn’t saying it in public. He was saying it in private to us and he absolutely meant it.

The feedback across the national MilReps was really strong. They said the UK has really got this in terms of marrying up the thinking of the old and the new and bringing them together and making the best of a hybrid force. That means we are not throwing things away that we spent billions of pounds on that actually can be highly effective. We are using those and growing and scaling the force with the new technology that comes in. We will see how effective it is over time. These are cutting-edge technologies. These are new ideas. But that is the essence of a military force that is thinking ambitiously about its future and how it will fight.

  1.    Chair:  Permanent Secretary, let me come back to you. In the last four years up to 2026, the Ministry of Defence budget has gone up in real terms by £16 billion. According to current plans, in the four years to 2030, we are expecting a further £11 billion increase in real terms. Those are mind-boggling numbers. How do you and the Ministry of Defence plan to deliver value for money, given this substantial further investment by the British taxpayer?

Jeremy Pocklington: I feel very responsible for that, and it is a core part of what all of us on the panel today and the wider leadership of defence are trying to achieve. There are a number of aspects to how we drive value for money. First, it is about having the right plan, ultimately to deliver the SDR strategic headmark, and planning on a truly integrated basis, rather than the previous joint basis. The Air Marshal has talked about that. The defence investment plan is the right plan, and that gives us a really sound basis on which to pivot to delivery.

Secondly, we need the right systems in place in the Department to make sure that, once we have made these decisions, we are driving value through that. Partly, that is about defence reform. It is about shifting accountabilities in the Department. It is about the creation of the National Armaments Director Group—we have heard a lot from Rupert today. Getting the relationship right between the NAD Group and MSHQ is really important, because having support but also challenge in the system will really help.

The third thing is about the detail of financial approvals. It is about making sure that we have a robust system in place around business cases, that they are of an appropriate quality and that they go through the right governance, to make sure we are testing them. We have heard in this hearing about over-optimism—optimism bias. It happens in all Departments. It has certainly been there in the MoD. We must have the right approvals. Ultimately, the Investment Approvals Committee, chaired by Aneen, oversees that system.

It is also about having the right wider governance and oversight in place. That ultimately stems from the departmental board. Rupert has an advisory board for the nuclear enterprise—that has its own board to oversee that work, to make sure we have people providing a second pair of eyes who have deep expertise and are helping us to challenge and ask questions about what we are doing, because it is incredibly complex at times. There are large numbers of first-of-a-kind programmes, as we have heard today, and making sure we are bringing together the expertise to help guide us on that is important.

  1.    Chair: My colleague will come in shortly on the Defence Nuclear Enterprise. On behalf of those of us who have been championing increased investment in our defence very vocally for the last couple of years, I want to say that we must at all costs ensure value for money, because otherwise I think it would severely damage the reputation of all involved.

Jeremy Pocklington: I strongly agree. The final point, if I may, because it is important, is that underpinning all of that is the efficiency programme we talked about earlier. That will also drive efficiency and productivity, which is key to maximising the pound to the warfighter—that is what we are trying to do.

Chair: We look forward to those efficiencies being realised, despite the scepticism that the Committee has heard regarding that. Given the lack of time, let me move quickly on to the Defence Nuclear Enterprise with Graeme Downie.

  1.    Graeme Downie: I am conscious of time, so may I ask witnesses to give short answers? There are quite a few bits I want to cover. First, the Mensa facility at AWE is five times over the original cost estimate and nearly a decade behind. What are you doing to ensure that that does not soak up an ever-increasing proportion of the defence budget, which could overshadow a lot of the other things we are trying to do? Jeremy, you are probably the best placed to answer that one.

Jeremy Pocklington: What I am going to propose, Mr Downie, is that if you want specific briefings on programmes connected to the nuclear enterprise, about which much of the information is held at secret, I would be very happy to do that with you. I think we are best doing that not in this hearing but in a private briefing, because these are critical programmes of intense interest and top priority.

Chair: We look forward to that briefing. Thank you very much for that undertaking. I am sure Graeme Downie will ensure that, given national security considerations, his questioning is compliant with that.

  1.    Graeme Downie: Of course. You have led me on to my second question. We have to keep a number of these elements secret or outside of open public scrutiny, and it is one of the largest parts of the defence budget. Is there a concern that, because it is hard to be transparent with the Defence Nuclear Enterprise, it is easier to be optimistic and for different costs to run out of control, where public scrutiny is not possible? How do you combat that inside the Defence Nuclear Enterprise as a matter of process? You mentioned the nuclear enterprise board, for example. What is its role, and how are you making sure that it holds you much more strongly to account than others, given that other scrutiny is not available to you?

Jeremy Pocklington: It is a really important question, Mr Downie, and it is something that we take very seriously in the Department. As you know, because you are alluding to it, the Defence Nuclear Enterprise is about just under a quarter of the budget now, and it is likely to remain that way for many years to come, given the number of large long-term programmes.

All those programmes are subject to a very similar approach to scrutiny as other programmes that we have talked about today, many of which Rupert has already referred to. They are required to have business cases; to have challenge within the Department, from Aneen’s teams; and to have external challenge in Government, including from the Cabinet Office, the major projects review group and the Treasury, as you would expect. Given the sensitivity of these programmes, including the one that you have referred to, in the Department we have also established the defence nuclear board, which includes non-executives, to ensure that we are providing a degree of challenge and oversight.

  1.    Graeme Downie: My concern is that, at the first mention of the Mensa facility, the response was immediately incredibly defensive. My question was not a specific question, which of course I would never ask in this forum; it was about how you are assuring yourself that we are not soaking up that proportion of the defence budget unnecessarily. The immediate response we got from you was defensive, which gives me a concern around culture inside the Department.

Jeremy Pocklington: Mr Downie, if I may, my immediate response was to offer you a private briefing so I could be more open and transparent with you, actually.

Graeme Downie: Yes, but might I suggest that that would be better at the end of an answer to the actual question?

Jeremy Pocklington: I do not want to go into details in this hearing, on national security grounds.

Graeme Downie: How are you assuring yourself and us that the budget is not—

Jeremy Pocklington: It is about having the systems in place to oversee all parts of the Department, including those parts of the Department that we cannot talk about publicly, as I have described.

Aneen Blackmore: May I offer an assurance? As we went through the defence investment plan, we were fully scrutinising the nuclear budget in exactly the same way as we were scrutinising the rest of the budget lines in defence—programme by programme, understanding the assumptions, and challenging them where appropriate. We also had specific sessions with the Treasury on the nuclear budget, so it was able to scrutinise and ask questions about our assumptions. It is treated in the same way as other parts of our budget, but with a recognition of where it is sensitive, and with a need to make sure the right security clearances are in place.

  1.    Chair: Ms Blackmore—DG Finance—with all due respect, all that scrutiny is happening within Departments. It is people marking their own homework. There is no parliamentary scrutiny. The plans to have a Select Committee look into this have been knocked around for well over the last two or three years, as far as I am aware. You can see the lack of trust and confidence in a bloating budget that, as Graeme Downie has been saying, has gone from 18% to 25% of the MoD budget.

Jeremy Pocklington: I understand the interest in the budget—it is a large part of the budget—but the Committee will appreciate, as I know you all do, the intense national security issues around this, which mean that we have to be very careful about the information. We are, though, supportive of that Select Committee being—

  1.    Chair: Permanent Secretary, we have already trodden this ground. We cannot keep continually talking about national security considerations when the issue at hand is an ever-burgeoning budget. The reason why Graeme Downie was getting exasperated is because we are not getting answers to those questions, and the lack of parliamentary scrutiny is palpable. If those questions could be answered, it would be good because none of them have actually been outside of the national security consideration grounds.
  2.    Graeme Downie: Again, my concern is whether you are looking at the reported delays to Astute, Dreadnought or Project Euston, or in my own constituency at the contingent docking facility at Rosyth, all these things have been talked about and do not happen, and therefore exist outside of parliamentary scrutiny. As the Chair said, none of the questions I have asked have been about the details or asking for any specific details that would cross over into national security grounds. What method can we use to ensure that such a huge chunk of the defence budget is properly scrutinised and that we have the right equipment and, indeed, the right people—something I will come on to in a second—to defend the country?

Jeremy Pocklington: That is why the Department is very supportive of the creation of this new Committee—my understanding is that it is in the process of being established—because that is the right forum to have that parliamentary scrutiny and oversight, which I support, of this element of my Department’s budget.

  1.    Graeme Downie: Would it not have been easier to say that in the first answer?

Again, my concern is that cultural issue, and you see it all the time. We are all understanding of the national security grounds when it comes to nuclear. I am concerned that when you say the word “nuclear”, everyone can retreat behind a shield immediately and not be open. I think the Department, and I am sure you would agree, would benefit from scrutiny being done in the correct way and in the correct forums.

Jeremy Pocklington: I am very supportive of scrutiny. In these programmes, it needs to be in the specific way, but I have always been very supportive of creating this new parliamentary Select Committee. My instinct is that it will happen in the next few months—

Chair: We await it with bated breath. Even in the last Parliament, I was aware of these discussions. It is a different permanent secretary and different Ministers—we have heard it all before—but as yet there is no such Select Committee, so there is no parliamentary scrutiny. That is to our collective detriment as a nation.

  1.    Graeme Downie: There are two other questions I would like to ask. One is a short one on Navy Lookout reporting this week on signing the Royal Navy support contract with Babcock, which I think expires next week. Can you assure us that that is in train and is being taken care of?

Jeremy Pocklington: You will hear more about this in the coming days. I have every confidence about that.

Graeme Downie: I take that as a yes.

Jeremy Pocklington indicated assent.

  1.    Graeme Downie: The final question I want to ask is around CASD and deterrence—don’t worry, I promise not to stray into anything that crosses the line. Again, it is not an unreasonable conclusion to say that at the moment where we are at with CASD cannot go on with extended patrols. I do not want to talk about the equipment; what I want to talk about is how we are supporting the people, both when they come off such a long patrol, but also how you are managing to recruit people to go on patrols, and how you are managing to convince them not only to go on, but to retain when they come back.

These are human beings who we are asking to do an incredible important thing which defends our country. I will not ask the question that I know you are unable to answer, but what are we doing to ensure those crews have the capability, and by extension those ships have the capability, to do the mission they have done for the last 50-plus years?

Jeremy Pocklington: It is an incredibly important question, and I was privileged enough myself to be there for the day zero for the return of the boat just over a week ago. I saw for myself the sacrifice and service of the crews, and the first thing I want to say is we really do owe them our thanks. You really do feel it when you meet the crews knowing the length of time they have served underwater. It is a very powerful and moving experience.

The Navy and the MoD do provide a lot of support. That is about payments, but it is also about welfare support given the length of time that we ask people to serve. But I recognise that there may well be more that we need to do—

Graeme Downie: What more do you think?

Jeremy Pocklington: I am not going to go into specifics until we have done the work—

Graeme Downie: But from previous patrols. This is not a one-off.

Jeremy Pocklington: We will continue to look at the support that we offer in the Department. As you know, there is an additional payment made where patrols last more than 100 days. This is about money, but it is about more than just money. However, if you have any specific proposals, Mr Downie—

Chair: I am sure we will be returning to this later.

  1.    Jesse Norman: Permanent Secretary, you have been clear that every aspect of the Defence Nuclear Enterprise is subject to heightened security and confidentiality issues. Is that right?

Jeremy Pocklington: You might be able to test me and find one that is not—but in essence, yes.

  1.    Jesse Norman: No, but the point is that you do not want to talk about the budget, you do not want to talk about operational details, and you do not want to talk about any of the details at any level of security or specificity.

Jeremy Pocklington: Not in a public environment.

  1.    Jesse Norman: Okay, that is interesting. Obviously, the amount we spend on our Nuclear Enterprise profoundly affects the rest of the budget available. As a Committee, we are dealing with the remnants of a protected Nuclear Enterprise and the rest in some respects. That is a severe challenge for this Committee, over and above the security concerns you have raised, which make it impossible to scrutinise the budget on the submarine enterprise itself. You have emphasised the security importance of this and the importance of confidentiality. Can you explain why The Times splashed on the return of HMS Vengeance on 17 November, including mention of the Secretary of State’s welcome to the crew and detailed interviews with crew members and their families? After 217 disclosed days at sea, how does that square with your insistence that there be no operational disclosure of security issues?

Mike Martin: And the name of the boat.

Jesse Norman: Quite! And the name of the boat, as my colleague points out.

Jeremy Pocklington: It is now established practice that day zero after a long patrol is a moment to thank the crews in person and note the importance of the continuous at-sea deterrent as the fundamental bedrock of our national security. That is what the Defence Secretary was doing on day zero. He was following other previous Defence Secretaries who have done that on previous day zeros. I think it is possible to do that.

  1.    Jesse Norman: Do you not regard it as having any operational significance that the duration of such deployments is now a public matter published by your Department, supposedly with your support as permanent secretary?

Jeremy Pocklington: I cannot talk in detail about operations, as you would understand.

  1.    Jesse Norman: That is completely risible. We have literally just had a briefing from your Department, from a Secretary of State. You cannot hold that position. The Cabinet Office tweeted the name of the boat and then deleted the name. It is extraordinary. You have to be critical of this. You cannot seriously suggest to me that it was not a serious breach.

Jeremy Pocklington: Let me finish, please, Mr Norman, because this is an incredibly important issue. It was not appropriate to publicise the name of the boat. That was corrected. That, again, is consistent with long-standing practices. However, the actual dates of day zeros, and therefore the duration of a mission, are public knowledge. That has also been long-standing practice, Mr Norman. I do not see the distinction that you are seeking to make.

  1.    Jesse Norman: Briefed out by your Department, by the Secretary of State, with his name present, with interviews with the crew and their families, and the name of the boat mentioned in The Times newspaper. I think you should be much more critical of that than you are being. You are not being critical at all at the moment. I would like it if you would condemn that, because I think it is a serious mistake.

Chair: Right—

Jesse Norman: Hang on a second. Let us allow the permanent secretary to respond, please.

Jeremy Pocklington: What the Defence Secretary was doing was following long-established practices.

Jesse Norman: Naming the boat?

Jeremy Pocklington: The dates of day zeros are public. It was incorrect to name the boat, and that has been corrected.

Jesse Norman: It does not make it a good idea. It is obviously a bad idea.

Chair: Right. We have your response, or the lack thereof, on the record. Let us move on to the final line of questioning.

  1.    Alex Baker: Permanent Secretary, it will not surprise you that we have touched a little on transparency and accountability. This is something we have asked you consistently about.

Jeremy Pocklington: Of course.

Alex Baker: You justified replacing the equipment plan by promising greater transparency through the defence investment plan. What evidence can you provide that Parliament is now getting more rather than less information about affordability, risk and deliverability than it received under the previous arrangements?

Jeremy Pocklington: The key thing is that the defence investment plan is a more comprehensive plan than the old equipment plan. It does not just cover some aspects of procurement; it provides a wider range of updates on our financial plans across infrastructure, people and R&D, as well as across the equipment programmes.

  1.    Alex Baker: It does not have any of the detail that the equipment plan used to have.

Jeremy Pocklington: It is a different document and a different approach from the equipment plan. We have made a very conscious decision to do that. That is because we are providing certainty where we can, but increasingly, given the importance of agility and adaptability, we also need to provide direction for the medium term without such detail in individual budget lines. The key point is that none of us knows exactly what types of autonomous equipment or drones Rupert’s teams should be buying in three years’ time, let alone five or 10 years’ time. It would be inappropriate now to have that level of detail in the defence investment plan, because there is a risk of spurious accuracy around it.

  1.    Alex Baker: Let me put it on the record that I do not think any of us feel that we have more information, rather than less. We are expecting an annual report on the DIP. What data and information will be in the annual report at the year point of the DIP?

Jeremy Pocklington: We will set that out in due course. We have said that we will publish the first annual update by July 2027. It is the sort of thing we would do before summer recess. The DIP itself was published on 30 June this year. That will update on progress and changes in our plans in those broad areas that I have already talked about.

  1.    Alex Baker: Will you commit to a process where we could have a conversation about what we as parliamentarians would like and expect to have in that report to help us to do our jobs?

Jeremy Pocklington: I have already said to the Chair that if the Committee makes recommendations, we will consider them in the usual way.

  1.    Alex Baker: Thank you. I am sure we will keep coming back to that. Mr Pearce, now is an opportunity for me to talk to you about my particular interest, which is industrial capacity. I am sorry that I was not in the meeting when you were talking about DFIS and your work. I want to ask you a very simple question. I am delighted with the commitment to spend 3% by 2030, but do we have the industrial capacity to make 3% of stuff?

Rupert Pearce: Today, probably not; by then, absolutely. We have to invest in reindustrialising. I am seeing very clearly the need for us to build that capacity all the way through to true warfighting readiness. For true warfighting readiness on a sustained basis—what we would call sustainment; in other words, an ability to project to our adversary our capability to outlast them in a long-enduring war, which I think is a crucial piece of deterrence—we will have to build those capabilities through dialogue and collaboration with industry. My instinct is that it will take us beyond our own more narrow defence industrial base to wrapping wider industry into, essentially, a transition to war. That is a very high priority inside the MoD today, and it dovetails into our direct war plans as well. It is a journey.

I am very pleased with how industry has come on board over the last year. We are working with them very closely on the size and shape of the industry and supply chain resilience, all the way down to the components of the supply chain—critical minerals and things like that. We are building that back up and projecting it forward—by the way, not just nationally but at a NATO level as well—using the CNAD to do that. We are identifying the gaps between now and 2030 that we, together as NATO, have to fill, so that we arrive in 2030 with industrial sustainment in place.

  1.    Alex Baker: When it comes to industrial capacity, there are other entities involved in making sure we have that industrial capacity—banks being absolutely key.

Rupert Pearce: Across Government as well.

Alex Baker: Working capital is the central issue in all this. What is your assessment of the availability of working capital for the industrial base? We are not talking about the primes here; we are talking about the deep industrial base, businesses that are not necessarily even innovating. They are making component parts of capabilities that our primes put together.

Rupert Pearce: Well said. I know you have been championing this for a while, and I absolutely agree with you. We are not where we need to be. That is why we are landing the DFIS, the defence finance and investment strategy, and why, on the road to that announcement, we have worked with financial services partners across the gamut of what is needed for our industry to up its game and be able to move at the pace we need.

  1.    Alex Baker: I am very much looking forward to the DFIS and was pleased to receive a briefing from the MoD on it last week. From what I know of it, working capital is not the focus. DFIS is about finding other pathways.

Rupert Pearce: Can I respectfully disagree with you there? You have to get at working capital from a number of different angles. I think you are partially right, in that we have to make sure that, in particular, smaller companies built deep within our supply chain have access to capital, for starters. We also have to attack it from the perspective of the flow-down of payment terms from us through to the primes and into the channels.

  1.    Alex Baker: It is chicken and egg. Ultimately, for us to have the industrial capacity to make 3% of stuff, companies need to be able to get the working capital to be able to hire bigger premises and more people, to have an opportunity to bid for the contracts.

Rupert Pearce: I agree. All I am saying is that liquidity in working capital terms is also an issue. You can provide liquidity into that system, otherwise than through invoices. You have to attack it from both ends, that is all I am saying. We are going to set standards of behaviour for our primes in terms of the way they nurture their subs. That will include the flow-down of our very generous payment terms. We tend to pay within five days. We need that to flow down quickly through the entire supply chain, from primes to subs and thereafter, so that smaller companies are not starved of working capital.

  1.    Alex Baker: I am delighted. That is exactly what you should be doing. What conversations are going on with the commercial banks? There is a lot in the DFIS about private equity and venture capital. I know that is your world, and I am delighted we are doing all that. You and I know that, in terms of the industrial base, those pathways are limited to a very small proportion of the industrial base. The majority of businesses just need to be able to get working capital from our banks to be able to move forward.

Rupert Pearce: I agree. You will be very pleased to hear that the cornerstones of the announcements coming out on the back of the DFIS on 1 December are some very important announcements by several clearing banks, saying that they will end the de-banking of our industry and will bring specific tailored products at volume to that community. That is a really welcome step that evidences the way in which big banks are coming back to defence and recognising their need to serve our country with these capabilities.

Chair: Thank you very much. Ladies and gents, my apologies that we have slightly overrun, but thank you for bearing with us and answering the questions.